Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

2025 IRC Building Code Latest Exam Prep Test Bank With 430 Questions and Correct Verified Answers/ IRC Building Code Test 2025 Answers (Brand New!)

Rating
-
Sold
-
Pages
82
Grade
A+
Uploaded on
24-03-2025
Written in
2024/2025

2025 IRC Building Code Latest Exam Prep Test Bank With 430 Questions and Correct Verified Answers/ IRC Building Code Test 2025 Answers (Brand New!)

Institution
IRC Building Code
Course
IRC Building Code

Content preview

2025 IRC Building Code Latest Exam Prep Test Bank
With 430 Questions and Correct Verified Answers/
IRC Building Code Test 2025 Answers (Brand New!)

If there is a conflict in the IRC between a general requirement and a specific
requirement, the ___________________ requirement must apply.
A. general
B. specific
C. the least restrictive
D. the most restrictive
B. Specific
The individual in charge of the department of building safety is referred to as the
__________________________.
A. chief official
B. building official
C. code administrator
D. chief building inspector
B. Building Official
Plumbing equipment repairs and replacements that require a permit, can be done
without a permit in emergency situations, so long as the permit application is
submitted to the building official within ________ of the repair/replacement.
A. the next working business day
B. 3 days
C. 7 days
D. 15 days
A. The next working business day
In the permit application, the applicant must __________________.
A. identify the work
B. describe the land
C. indicate occupancy
D. A through C



pg. 1

,D. Identify the work, Describe the land and Indicate occupancy.
An application for a permit is considered abandoned __________ after the date of
filing unless such application has been pursued in good faith or a permit has been
issued.
A. 30 days
B. 60 days
C. 90 days
D. 180 days
D. 180 days
Work approved by a permit must be commenced within ___________ of the
issuance of that permit.
A. 30 days
B. 60 days
C. 90 days
D. 180 days
D.
The building official is authorized to suspend or revoke a permit issued wherever
the permit is issued in error or on the basis of _________________ information.
A. incorrect
B. inaccurate
C. incomplete
D. A through C
D. Incorrect, Inaccurate or Incomplete
The building permit, or a copy of the permit, must be kept ______________ until
completion of the project.
A. at the job site
B. at home
C. at the office
D. with you at all times
A. At the job site
Submittal documents that consist of construction documents must be submitted in
_______________ or more sets with each application for a permit.
A. one

pg. 2

,B. two
C. three
D. four
B. two
True or False: Where required by the statutes of the jurisdiction in which the
project is to be constructed, construction documents in submittal documents must
be prepared by a registered design professional.
A. True
B. False
A. True
The construction documents submitted with the permit application must be
accompanied by a site plan that shows the _____________________.
A. size of the new construction
B. location of the new construction
C. existing structures
D. A through C
D. Size of the new construction, Location of the new construction and existing
structure
The construction documents submitted with the permit application for a demolition
must be accompanied by a site plan that shows the _____________.
A. construction to be demolished
B. location and size of existing structure
C. construction that will remain on the site or plot
D. A through C
D. Construction to be demolished, Location and size of existing structure and
Construction that will remain on the site or plot
Where the building official issues a permit, the construction documents must be
approved in writing or by a stamp that states
____________________________________.
A. ACCEPTED
B. ACCEPTED AND REVIEWED
C. REVIEWED FOR CODE COMPLIANCE
D. REVIEWED BY INSPECTOR


pg. 3

, C. REVIEWED FOR CODE COMPLIANCE
One set of approved construction documents must be retained by the building
official for a min. period of __________ from date of completion of the permitted
work.
A. 30 days
B. 60 days
C. 90 days
D. 180 days
D. 180 days
Permits for temporary structures must be for a max of ___________.
A. 60 days
B. 90 days
C. 180 days
D. 220 days
C. 180 days
True or False: A permit is invalid if the fees, prescribed by law, are not paid.
A. True
B. False
A. True
True or False: Upon notification from the permit holder or his agent, the building
official must make any necessary inspections for on-site construction.
A. True
B. False
A. True
If different sections of the IRC specify different materials, methods of construction
or other requirements, the _______________ must be applied.
A. least restrictive
B. most restrictive
C. Either A or B
D. Neither A nor B
B. Most Restrictive



pg. 4

Written for

Institution
IRC Building Code
Course
IRC Building Code

Document information

Uploaded on
March 24, 2025
Number of pages
82
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • irc b
$30.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
muriithikelvin Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
1558
Member since
3 year
Number of followers
572
Documents
3459
Last sold
1 hour ago
GOLD-RATED TOP SELLER ON STUVIA – YOUR TRUSTED HUB FOR EXCEPTIONAL STUDY RESOURCES! ACHIEVE MORE WITH EXPERTLY CRAFTED MATERIALS THAT GUARANTEE RESULTS!

Feeling overwhelmed by exams? We’re here to help. Our study materials help you focus, build confidence, and walk into your exams ready. Compiled using real past exams, these resources give you valuable insight into the kinds of questions to expect and how to approach them — helping you maximize your scores and study smarter. Why Choose Us? Gold-rated seller. 1,250+ happy students. Trusted resources for healthcare and certification success. Friendly support whenever you need it.

Read more Read less
3.9

302 reviews

5
148
4
57
3
47
2
17
1
33

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions