COB 300 OPERATIONS TEST 2
QUESTIONS WITH COMPLETE
SOLUTIONS
Improving Process Capability - Answer--Simplify
-Standardize
-Mistake-proof
-Upgrade equipment
-Automate

Centered Process - Answer--3 sigma: defects 2,700 parts per million
-6 sigma: defects 0.002 parts per million

Non-Centered Process - Answer--3 sigma: defects 67,000 parts per million
-6 sigma: defects 3.4 parts per million

Moment-of-truth analysis - Answer--experience enhancers
-standard expectations
-experience detractors
(order qualifier/order winner)

True or False: X-bar chart and R chart should be used together to find if a process is
under control. - Answer-True

True or False: If all observations are within UCL and LCL of control charts, we are sure
that the process is under control. - Answer-False

True or False: Process capability ratio can be used when a process is not centered. -
Answer-False

In order to track proportion of defectives, c-chart should be used. - Answer-False

Capacity - Answer--Ability to produce at a given volume in a specified amount of time
-Upper limit or ceiling on the load that an operating unit can handle
-Need a balance between too much and too less capacity
-Capacity planning is more difficult in service sector

Key questions for capacity planning - Answer--What kind of capacity is needed?
-How much is needed to match demand?
-When is it needed?

Capacity Decisions - Answer--impact the ability of the organization to meet future
demands

,-affect operating costs
-are a major determinant of initial cost
-often involve long-term commitment of resources
-can affect competitiveness
-affect the ease of management
-Have become more important and complex due to globalization
-need to be planned for in advance due to their consumption of financial and other
resources

Defining and measuring capacity - Answer--Measure capacity in units that do not
require updating

Design capacity - Answer-The maximum output rate or service capacity an operation,
process, or facility is designed for
-Maximum theoretical output in a given period

Effective capacity - Answer--Capacity the firm expects to achieve under current
operating conditions
-Design capacity minus allowances such as personal time and maintenance

True or False: Often effective capacity is lower than design capacity - Answer-True

Determinants of effective capacity - Answer-Facilities
Product and service factors
Process factors
Human factors
Policy factors
Operational factors
Supply chain factors
External factors

Capacity strategies - Answer-Strategies are typically based on assumptions and
predictions about: long-term demand patterns, technological change, competitor
behavior

Capacity Cushion - Answer-extra capacity used to offset demand uncertainty

Capacity cushion strategy - Answer--organizations that have greater demand
uncertainty typically have greater capacity cushion
-organizations that have standard products and services generally have smaller
capacity cushion

Long-term considerations - Answer-relate to overall level of capacity requirements;
require forecasting demand over a time horizon and converting those needs into
capacity requirements

, Short-term consideration - Answer-Relate to probable variations in capacity
requirements; less concerned with cycles and trends than with seasonal variations and
other variations from average

Calculating processing requirements requires - Answer--Demand forecast (reasonably
accurate)
-Standard processing time
-Available work time

Additional challenges of service capacity - Answer--Need to be near customers
-Inability to store services
-Degree of demand volatility

Leading - Answer-Build capacity in anticipation of future demand increases

Following - Answer-build capacity when demand exceeds current capacity

Tracking - Answer-Similar to the following strategy, but adds capacity in relatively small
increments to keep pace with increasing demand

Bottleneck operation - Answer-An operation in a sequence of operations whose
capacity is lower than that of the other operations

Economies of Scale - Answer-if the output rate is less than the optimal level, increasing
the output rate results in decreasing average unit costs

Reasons for economies of scale - Answer-Fixed costs are spread over a larger number
of units
Construction costs increase at a decreasing rate as facility size increases
Processing costs decrease due to standardization

Diseconomies of scale - Answer-if the output rate is more than the optimal level,
increasing the output rate results in increasing average unit costs

Reasons for diseconomies of scale - Answer-Distribution costs increase due to traffic
congestion and shipping from a centralized facility rather than multiple smaller facilities
Complexity increases costs
Inflexibility can be an issue
Additional levels of bureaucracy

Constraint - Answer-something that limits the performance of a process or system in
achieving its goals

Constraint categories - Answer-Market
Resource
Material

Document information

Uploaded on
March 20, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer
4.0
(46)
Sold
289
Followers
67
Items
18421
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions