COB 300 OPERATIONS EXAM #2
QUESTIONS WITH COMPLETE
SOLUTIONS
capability index - Answer-used to assess the ability of a process to meet specifications;
to be deemed capable this must be of at least 1.00 though this means the process is
barely capable; want to aim for at least 1.33

process capability index, Cp - Answer-Specification width/process width OR (upper
specification - lower specification)/6sigma

process capability, Cpk - Answer-used if process is not centered; (upper specification -
process mean)/3sigma AND (process mean - lower specification)/3sigma

reliability - Answer-ability of a product, service, part, or system to perform its intended
function under a prescribed set of conditions; is a probability

independent events - Answer-events whose occurrence or nonoccurrence does not
influence each other

probability rules - Answer-Rule 1: If two or more events are independent and success is
defined as the probability that all of the events occur, then the probability of success is
equal
Rule 2: If two events are independent and success is defined as the probability that at
least one of the events will occur, the probability of success is equal to the probability of
either one plus 1.00 minus that probability multiplied by the other probability
Rule 3: If two or more events are involved and success is defined as the probability that
at least one of them occurs, the probability of success is 1-P (all fail)

redundancy - Answer-the use of backup components to increase reliability

mean time between failures (MTBF) - Answer-the average length of time between
failures of a product or component

z - Answer-(T - mean wear-out time)/standard deviation of wear-out time

availability - Answer-fraction of time a piece of equipment is expected to be available for
operation; = MTBF/MTBF + MTR where MTR=mean time to repair, including waiting
time

capacity - Answer-the upper limit or ceiling on the load that an operating unit can handle

design capacity - Answer-maximum designed service capacity or output rate

, effective capacity - Answer-design capacity minus personal and other allowances

efficiency - Answer-(actual output/effective capacity) x 100%

capacity utilization - Answer-(actual output/design capacity) x 100%

capacity cushion - Answer-extra capacity used to offset demand uncertainty

steps in capacity planning process - Answer-estimate future capacity requirements,
evaluate existing capacity and facilities and identify gaps, identify alternatives for
meeting requirements, conduct financial analyses of each alternative, assess key
qualitative issues for each alternative, select the alternative to pursue that will be best in
the long term, implement the selected alternative, and monitor results

bottleneck operation - Answer-operation in a sequence of operations whose capacity is
lower than that of the other operations

economies of scale - Answer-if the output rate is less than the optimal level, increasing
the output rate results in decreasing average unit costs

diseconomies of scale - Answer-if the output rate is more than the optimal level,
increasing the output rate results in increasing average unit costs

constraint - Answer-something that limits the performance of a process or system in
achieving its goals

break-even point - Answer-volume of output at which total cost and total revenue are
equal

indifference point - Answer-quantity that would make two alternatives equivalent

cash flow - Answer-difference between cash received from sales and other source, and
cash outflow for labor, material, overhead, and taxes

present value - Answer-sum, in current value, of all future cash flows of an investment
proposal

aggregate planning - Answer-intermediate-range capacity planning, usually covering 2
to 12 months; goal is to achieve a production plan that will effectively utilize the
organization's resources to match expected demand

sales and operations planning - Answer-intermediate-range decisions to balance supply
and demand, integrating financial and operations planning

Document information

Uploaded on
March 20, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer
4.0
(46)
Sold
289
Followers
67
Items
18421
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions