Infrastructure Questions with 100% Correct Answers |
Verified | Latest Update
Name:Jingyuan Wang
Date:03/10/2025
Touchstone Task 1: Planning a Network
Review the scenario and client expectations about Greenfield Properties.
Based on the information provided by the client, answer the following questions in 2-4
sentences each. Be sure to explain your answers in detail.
How many employees will the new company have, and how many total devices,
including PCs, tablets, and smartphones? (Ref: Touchstone Scenario)
The new company, Greenfield Properties, will have 50 employees. They will need to be able
to support a range of devices, from PCs to tablets to smartphones, that will easily total about
150 devices. This is assuming each employee has a main device (PC) and one or more
secondary devices like tablets or smartphones for mobility and communications.
What network architecture will be used: client/server or peer-to-peer? Why? (Ref:
Types of Networks)
The network architecture for Greenfield Properties will be client/server. This is because
client/server networks provide centralized control, security, and resource management, which
are essential for a company with multiple devices and employees. A client/server architecture
also facilitates easier management of shared resources, like printers and files, and ensures
scalability as the company grows.
When on-site employees access the network, will it be a PAN, LAN, or WAN? Why?
(Ref: Types of Networks)
When on-site employees access the network, it will be a LAN (Local Area Network). A LAN is
ideal for connecting devices within a limited geographic area, such as an office or building.
Since all employees are on-site, the LAN will provide high-speed communication and allow for
efficient file sharing and resource management within the company.
What type(s) of cable should be used to connect the in-house hosts to the switch or
router? (Ref: Coaxial & Twisted Pair Cables)