When should an approved lift plan be re-approved? - 🧠 ANSWER ✔✔D. If
there is any deviation from the original lift plan.
Electrical hazards in the lift area and swing direction and degree are factors
to consider in preparing which portion of a lift plan? - 🧠 ANSWER ✔✔D.
Crane Placement
Capacities for crawler cranes that have outrigger extensions may not
exceed ________. - 🧠 ANSWER ✔✔D. 85 perfect of tipping
When planning a lift involving two cranes, calculate the lowest net
capacities that both cranes will have during the lift. The next step is to
______. - 🧠 ANSWER ✔✔A. Make sure that the sum of the lowest rated
net capacities of the cranes exceeds the load weight.
A lift plan should be discussed ______. - 🧠 ANSWER ✔✔D. At a pre-lift
meeting where all personnel in the lift are present.
COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
1
STATEMENT. ALL RIGHTS RESERVED
, What is meant by the term "two blocking?" - 🧠 ANSWER ✔✔B. The load
block contacts the boom point sheaves
Lifting 20,000 lbs with a 2-leg bridle sling at a 30° horizontal sling angle,
what is the force applied to each leg? - 🧠 ANSWER ✔✔20,000 lbs.
In multiple crane lifts using an equalizer beam, the weight of the beam
should be considered: - 🧠 ANSWER ✔✔Part of the load weight
What is required if there is deviation from the lift plan? - 🧠 ANSWER ✔✔A
new lift plan
On level ground using skids and rollers, what percent of the weigh of the
load should yield the required line pull as a general rule of thumb? - 🧠
ANSWER ✔✔5%
All of the following are results of unbalanced reeving of the block except: -
🧠 ANSWER ✔✔Wear on the hook
Before a spreader bar or beams can be used they MUST have been: - 🧠
ANSWER ✔✔Tested and approved
When materials are being hoisted to an upper level, a tag line is used to: -
🧠 ANSWER ✔✔Help control the load
COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
2
STATEMENT. ALL RIGHTS RESERVED
2024/2025 Exam Questions Marking
Scheme New Update | A+ Rated
When should an approved lift plan be re-approved? - 🧠 ANSWER ✔✔D. If
there is any deviation from the original lift plan.
Electrical hazards in the lift area and swing direction and degree are factors
to consider in preparing which portion of a lift plan? - 🧠 ANSWER ✔✔D.
Crane Placement
Capacities for crawler cranes that have outrigger extensions may not
exceed ________. - 🧠 ANSWER ✔✔D. 85 perfect of tipping
When planning a lift involving two cranes, calculate the lowest net
capacities that both cranes will have during the lift. The next step is to
______. - 🧠 ANSWER ✔✔A. Make sure that the sum of the lowest rated
net capacities of the cranes exceeds the load weight.
A lift plan should be discussed ______. - 🧠 ANSWER ✔✔D. At a pre-lift
meeting where all personnel in the lift are present.
COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
1
STATEMENT. ALL RIGHTS RESERVED
, What is meant by the term "two blocking?" - 🧠 ANSWER ✔✔B. The load
block contacts the boom point sheaves
Lifting 20,000 lbs with a 2-leg bridle sling at a 30° horizontal sling angle,
what is the force applied to each leg? - 🧠 ANSWER ✔✔20,000 lbs.
In multiple crane lifts using an equalizer beam, the weight of the beam
should be considered: - 🧠 ANSWER ✔✔Part of the load weight
What is required if there is deviation from the lift plan? - 🧠 ANSWER ✔✔A
new lift plan
On level ground using skids and rollers, what percent of the weigh of the
load should yield the required line pull as a general rule of thumb? - 🧠
ANSWER ✔✔5%
All of the following are results of unbalanced reeving of the block except: -
🧠 ANSWER ✔✔Wear on the hook
Before a spreader bar or beams can be used they MUST have been: - 🧠
ANSWER ✔✔Tested and approved
When materials are being hoisted to an upper level, a tag line is used to: -
🧠 ANSWER ✔✔Help control the load