What are the 3 basic types of documents used in
construction contracts - ✔✔ANSW✔✔..a. Bidding and
Contract Requirements
b. Drawings
c. Specifications
Which of the following are included in the Bidding
Documents but not in the Construction Contract
Documents - ✔✔ANSW✔✔..a. Instructions to Bidders
b. Bid Form
T or F? Specs describe the construction in text form. -
✔✔ANSW✔✔..True
T or F? Construction specs apply on to the Construction
phase of a project. - ✔✔ANSW✔✔..False
,T or F? Development of construction specs for a project
begins during the Contract Document phase. -
✔✔ANSW✔✔..False
T or F? Procurement docs include construction specs -
✔✔ANSW✔✔..True
T or F? Design-Bid-Build and Design-Build are two valid
methods to procure a construction project. -
✔✔ANSW✔✔..True
T or F? Contract Documents are identified in the
Agreement for a construction project. -
✔✔ANSW✔✔..True
T or F? Drawings are the graphic descriptions of the work
to be performed by the Contractor. - ✔✔ANSW✔✔..True
CSI PageFormat establishes all but which of the following
for appearance of the Sections?
a. Article titles
b. Page margins and indent settings
c. Type and font size
d. Bolding and underlining of headings -
✔✔ANSW✔✔..a. Article titles
, Which of the following are advantages for following CSI
PageFormat?
a. Classic appearance of PageFormat enhances authority
of specs
b. PageFormat is suitable for word processing programs
c. PageFormat is adaptable for construction specs of
varying complexity
d. Text is readable - ✔✔ANSW✔✔..b. PageFormat is
suitable for word processing programs
c. PageFormat is adaptable for construction specs of
varying complexity
d. Text is readable
T or F? CSI PageFormat should be adapted to specific
capabilities and practices of the architectural/engineering
firm. - ✔✔ANSW✔✔..True
T or F? Sophisticated or complex adaptations of CSI
PageFormat increases the difficulty for consulting design
pros to produce consistent-appearing specs. -
✔✔ANSW✔✔..True
The four methods of specifying accord to The Project
Resource Manual/CSI Manual of Practice are all except
which of the following?
a. Performance
b. Generic