100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

PATH 1000 A+ Passed Solutions Questions And Answers 2025

Rating
-
Sold
-
Pages
31
Grade
A+
Uploaded on
12-03-2025
Written in
2024/2025

PATH 1000 A+ Passed Solutions Questions And Answers 2025

Institution
Path 1000
Course
Path 1000











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Path 1000
Course
Path 1000

Document information

Uploaded on
March 12, 2025
Number of pages
31
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PATH 1000 A+ Passed Solutions
Questions And Answers 2025

CBTC is called "communication-based" because? - Answer - Trains and wayside computers
communicate with each other by means of a data radio link.



ATC-equipped trains are localized using? - Answer - Data read from wayside transponders



What is a part of the localization process? - Answer - The car-borne ATC equipment determines
the length of the train, the car-borne ATC's train length is equal to or greater than the length
reported by the PA-5 rolling stock, and the train engineer confirms the length of the train



What does it mean when the front end of a train is sieved? - Answer - The Zone Controller has
determined that there is nothing between the front of the train and the next track circuit
boundary.



When an ATC-equipped train is following a non-ATC train, the ATC train's MAL will generally
reflect? - Answer - The entering end of the track circuit in approach to the track circuit occupied
by the non-ATC train



An ATC train is rounding a curve. There are no trains ahead, no wayside signals in the area, and
no temporary speed limits in effect. The limits of the train's maximum allowable speed are? -
Answer - The speed limit from the car-borne map.



What is the allowable speed for passing a flashing green or flashing yellow ATC signal? - Answer
- As displayed on the TOD

,When walking in the track area, employees must not walk or step on? - Answer - Running rails,
train stops, transponders



What function of the ATC car-borne equipment is verified in the Daily Test? - Answer - Triggering
an emergency brake application



Which of the following is not included on the speed dial? - Answer - A service brake application
triggered by the car-borne ATC



Q: When the speed is in the yellow zone of the speed dial: - Answer - The train engineer must
apply service braking to slow the train.



When the station dwell time reading is displayed in green reading ":07" it means: - Answer - The
train should depart in 7 seconds



IF the "ATC Failure" indication appears, and no other disruption to operation is noted, the train
engineer should: - Answer - Immediately inform the trainmaster and follow his/her instructions.



When a triangle appears alongside the MAL bar, which of these is present at the location
indicated by the triangle? - Answer - Beginning of a slow speed order or work zone



A MAL bar with green and yellow sections means that: - Answer - The training is being routed
out of CBTC Mainline territory



Which of the following is not a possible operating route in CBTC mainline territory? - Answer -
Wayside



What position of the ATC Mode switch is used when transitioning between territory types? -
Answer - MCS

,As a train engineer, you start a train from a station in MCS, and some distance later, you
encounter two yellow flags but no "work zone ahead" indication is displayed on the CBTC TOD.
What is your best course of action? - Answer - Stay in MCS mode, proceed as appropriate for
the flagging arrangement, advise Control Center of the flags.



When a train enters yard territory from CBTC mainline territory, when does the operating mode
change? - Answer - When the front of the train enters yard territory



If a train is in motion, only the following mode change is acceptable: - Answer - Release to MCS



ATC Bypass mode is? - Answer - In bypass mode, the maximum allowable train speed is 40 mph



Which of the following will not trigger an emergency brake application? - Answer - Traversing a
failed track circuit in release mode.



Which of these statements about yard mode operation is true? - Answer - ATC enforces a
12mph speed limit, but the train engineer is responsible for complying with any other
restrictions.



Which of the following are positions of the ATC mode switch? - Answer - MATC, MCS, Release



What will happen if MATC mode is selected on the ATC Mode switch while the train is in motion
operating in MCS? - Answer - The train stops with an emergency brake application



What is the normal position of the ATC Mode switch while in yard territory? - Answer - MCS



When a call-on (restricting signal aspect) is displayed at an interlocking signal in CBTC mainline
territory, what ATC mode enable the train to pass it? - Answer - Release

, Which of the following conditions would result in the TOD indicating an 'unknown" operating
mode? - Answer - The ATC car-borne equipment has completely failed



As a train engineer, on inspecting the ATC Bypass switch when preparing a train for service, you
find the seal is missing. What should you do? - Answer - Inform the trainmaster (or yard
foreman) that the seal is missing.



What must the train engineer do upon leaving CBTC mainline territory? - Answer - Acknowledge
the territory and operate normally for the territory you are entering.



What circumstances might require starting a train movement in release mode? - Answer - The
train is stored on the same track and within 50 feet of another train in CBTC mainline territory



As a train engineer operating in MATC mode, you arrive in a station where a CBTC train hold is in
effect. After some delay, the trainmaster directs you via voice radio to depart, even though the
train hold is in effect. What should you do? - Answer - Select MCS mode, touch the "hold"
indication on the TOD, and depart from the station in MCS



The best strategy for operating a train in MCS mode? - Answer - Learn each section of the road
thoroughly so that you can anticipate exactly the speed profiles under CBTC operation. This way,
you can keep out of the yellow zone. Also be ready to slow down as you approach the end of a
MAL and use the CBTC audible alert to decide exactly when to begin braking.



What position of the ATC mode switch is used when transitioning between territory types? -
Answer - MCS



As a train engineer, you start a train from a station in MCS, and some distance later, you
encounter two yellow flags no "work zone ahead" indication is displayed on the CBTC TOD.
What is your best course of action? - Answer - Stay in MCS mode, proceed as appropriate for
the flagging arrangement, advise Control Center of the flags.
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
GRADEQUEEN

Get to know the seller

Seller avatar
GRADEQUEEN phoenix university
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
11 months
Number of followers
0
Documents
151
Last sold
-
GRADEQUEEN

TIGHT DEADLINE? I CAN HELP Grade queen specializes in providing guides that includes exams, test and quiz questions. we work every aspect and take into account your wishes everyday. Feel Free to contact me for any personalized exams you may be in search for. Thank you & All the Best.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions