Ans You are the project manager on a project where the scope has expanded. The change has been approved by the change control board (CCB). What steps must you take to acknowledge the new scope? Each correct answer represents a complete solution. Choose all that apply. A. Communicate the change to stakeholders and team members. B. Update the project management plan. C. Log the request on the change request log. D. Submit a change request. A scrum meeting, which is part of the Agile methodology. Ans In which meeting do team members come prepared to answer the following three questions? What work they completed yesterday? What work they will complete today? What obstacles stand in their way? A. A clear chain of command. B. Growth potential and a career path for employees. Here are the advantages of the functional organization: Growth potential and a career path for em

Montrer plus Lire moins










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Infos sur le Document

Publié le
10 mars 2025
Nombre de pages
22
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

WGU C176 Pre-Assessment questions with verified
answers
Ans✓✓✓ You are the project manager on a project where the scope has
expanded. The change has been approved by the change control board (CCB).
What steps must you take to acknowledge the new scope?


Each correct answer represents a complete solution. Choose all that apply.


A. Communicate the change to stakeholders and team members.
B. Update the project management plan.
C. Log the request on the change request log.
D. Submit a change request.


A scrum meeting, which is part of the Agile methodology. Ans✓✓✓ In which
meeting do team members come prepared to answer the following three
questions?
What work they completed yesterday?
What work they will complete today?
What obstacles stand in their way?


A. A clear chain of command.
B. Growth potential and a career path for employees.


Here are the advantages of the functional organization:
Growth potential and a career path for employees

,The opportunity for those with unique skills to flourish
A clear chain of command (each staff member has one supervisor—the functional
manager)
Answers D and C are incorrect. Here are the disadvantages of the functional
organization:
Project managers have limited to no authority.
Multiple projects compete for the same limited resources.
Resources are generally committed part-time to the project rather than full-time.
Issue resolution follows the department chain of command.
Project team members are loyal to the functional manager. Ans✓✓✓ What are
the advantages of the functional organization?


Each correct answer represents a complete solution. Choose all that apply.


A. A clear chain of command.
B. Growth potential and a career path for employees.
C. Issue resolution follows the department chain of command.
D. Full-time resources are assigned to


A. Adjourning
B. Storming
D. Forming
F. Norming Ans✓✓✓ Which of the following are the stages of development that
project teams progress through?


Each correct answer represents a complete solution. Choose all that apply.

, A. Adjourning
B. Storming
C. Acquiring
D. Forming
E. Compromising
F. Norming
G. Negotiating


A. Administering the change control process
C. Performing quality assurance/governance activities
D. Performance measuring and reporting


Here are the activities involved in the monitoring and controlling process:
Monitoring the risks/issues log
Performance measuring and reporting
Performing quality assurance/governance activities
Administering the change control process
Monitoring the budget Ans✓✓✓ What are the activities involved in the
monitoring and controlling process?


Each correct answer represents a complete solution. Choose all that apply.


A. Administering the change control process
B. Defining the high-level risks
$18.49
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
cracker Chamberlain School Of Nursing
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
2016
Membre depuis
3 année
Nombre de followers
1342
Documents
46956
Dernière vente
3 heures de cela
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

370 revues

5
162
4
84
3
53
2
22
1
49

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions