Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

CDT FINAL PRACTICE TEST QUESTIONS WITH ANSWERS 2025/2026 GRADED A+

Note
-
Vendu
-
Pages
8
Grade
A+
Publié le
25-02-2025
Écrit en
2024/2025

Alternates - A defined portion of the work that is priced separately and thus provides an Life cycle cost - Based on the total cost of ownership rather than the initial costs Considerations that influence life cycle costs: -design decisions about materials and equipment -maintenance, operation, and replacement of materials and equipment -alterations, renovations, and improvements -initial construction value analysis - Getting the most "bang for your buck" Design Considerations (6 of them) - Aesthetics Regulatory requirements (codes and regulations) Functional elements (adequate space for design, suitability to construction type used, ....) Constructability Sustainability Budget What is included in Construction Documents - Procurement requirements + contract documents

Montrer plus Lire moins
Établissement
Cdt
Cours
Cdt









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Cdt
Cours
Cdt

Infos sur le Document

Publié le
25 février 2025
Nombre de pages
8
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

CDT FINAL PRACTICE TEST QUESTIONS WITH ANSWERS
2025/2026 GRADED A+
Alternates - A defined portion of the work that is priced separately and thus provides an
Life cycle cost - Based on the total cost of ownership rather than the initial costs
Considerations that influence life cycle costs:
-design decisions about materials and equipment
-maintenance, operation, and replacement of materials and equipment
-alterations, renovations, and improvements
-initial construction

value analysis - Getting the most "bang for your buck"

Design Considerations (6 of them) - Aesthetics
Regulatory requirements (codes and regulations)
Functional elements (adequate space for design, suitability to construction type used,
....)
Constructability
Sustainability
Budget

What is included in Construction Documents - Procurement requirements + contract
documents

What is included in Procurement Requirements - -solicitation or request for proposal
-instructions for procurement
-available information
-procurement forms and supplements

Bid vs Proposal - Bid = offer to perform work or supply materials or goods at a specific
price - response to a solicitation - usually PUBLIC
Proposal = offer of terms and conditions fo Work - response to a request for proposal -
usually PRIVATE

Solicitation - -invitation to bid = Owner is selective by only inviting certain bidders
-advertisement to bid = Owner accepts all qualified bidders

Instructions for Procurement - Second part of the procurement requirements:
-requirements with which bidders must comply with before, during, and following
submission of bids

Available Information - for procurement requirments - Includes budget information,
property boundaries, geotech data, permit applications required, etc...

Procurement Forms - Documents prepared for use by bidders
Request specific information so that bids can be evaluated evenly and fairly

, What is included in the Contract Documents - Contract forms
Project forms
Conditions of the contract
Specifications
Drawings
Addenda
Contract modifications

Contract Forms (part of contract docs) - Includes:
-notice of award
-agreement forms
-**NOTICE TO PROCEED**

Project Forms (part fo contract docs) - -bond forms
-certificates (submittal transmittal, product list form, insurance certificate...)
-modification forms (RFIs, substitution requests, field order form,...)
-close out forms (certificate of compliance, warranty, certificate of substantial
completion)

Conditions of the Contract (part of contract docs) - -defines basic rights, responsibilities,
and relationships of parties involved
-Supplementary Conditions (insurance reqs, OSHA reqs, wage rate reqs,...)

Revisions and Clarifications (part of contract docs) - -before receipt of bid:
-addenda
-approved bid-phase substitution requests
-between receipts of bids and contract signing
-post-bid addenda
-changes per negotiations
-approved substitution requests
-after contract signing
-change orders
-change directives
-field orders
-written amendments

Addenda - If substitution request is accepted, indicate to ALL bidders an addendum
Purpose is to clarify, revise, add, or delete information

What types of drawings are created through the project stages - Design stage drawings
(phase 2):
1. Conceptual
2. Schematic
3. Design development
$9.99
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
BOARDWALK Havard School
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
173
Membre depuis
1 année
Nombre de followers
6
Documents
18774
Dernière vente
6 jours de cela
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.6

31 revues

5
12
4
6
3
7
2
0
1
6

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions