NERC Test Questions With 100% Correct Answers .A Reliability Adjustment Arranged Interchange must be approved by who? - ANSWER-Only the source and sink, the key word to remember is Adjustment .A TO must coordinate its load shedding plans, excluding UFLS, with who? - ANSWER-Other interconnected TO and BA .According to EOP-002, what actions are acceptable in an operating capacity or energy emergency by a BA? - ANSWER-Bringing on all available generation, postponing equipment maintenance, scheduling interchange purchases, and reduce firm load .According to NERC, where should voltage be maintained during restoration? - ANSWER-90 to 110 percent of Nominal .After a system modification is made, how long does the TO have to update restoration plans? - ANSWER-90 days .After how long does a complete loss of monitoring capability meet reporting threshold? - ANSWER-30 minutes .After how long must a complete loss of voice communications be reported? - ANSWER-30 minutes .An RC backup control facility is not required to be available during what two conditions? - ANSWER-Planned outages of two weeks or less; unplanned outages .BA and RC are given responsibility and authority to make decisions to alleviate what? - ANSWER-Capacity and energy emergencies .BA not serving native load minimum frequency bias is based on... - ANSWER-The montlhly average Frequency Bias is at least 1 % of the BA estimated yearly peak generation per .1 Hz (Load = 1 % demand; No Load = 1 % Gen) .BA serving native load minimum frequency bias is based on... - ANSWER-The monthly average Frequency Bias is at least 1% of the BA estimated yearly peak demand per .1 Hz (Load = 1 % demand; No Load = 1 % Gen) .By what means does an RC notify other RCs of a declared EEA? - ANSWER-The RCIS - Reliability Coordinator Information System .Describe Attachment 1 and attachment 2 of EOP-004 Event Reporting: - ANSWER-Att 1 is the events required to be reported; Att 2 is the Event Reporting Form .During an EEA 2 what must BA and market participants with resources do to help? - ANSWER-Immediately contact the Energy Deficient Entity .Each BA and RC shall have the ____ and clear decision-making ____ to take whatever actions are needed to ensure reliability of its respective area... - ANSWER-responsibility and authority .Each BA must report its Bias Setting and the method for determining it to which entity? - ANSWER-NERC Operating Committee .Emergency plans are made for what three conditions? - ANSWER-Generating Capacity loss, Transmission System loss, Load Shedding plans .Events meeting event report threshold: - ANSWER-Damage, destruction or physical threats physical threats to a facility, physical threats to a control center, public appeal for load reduction, system-wide voltage reduction 3%, manual or automatic firm load shedding 100MW; voltage deviation +/- 10% for 15 minutes; IROL or SOL violation, loss of Firm load, System separation (islanding), generation loss, complete loss of offsite power to a nuclear plant, transmission loss, control center evacuation, complete loss of voice comm or monitoring capabilities .Following a Contingency or other event that results in an IROL violation, how long does the TO have to bring the system back into limits? - ANSWER-As soon as possible and not to exceed 30 minutes .For how long must a BES control center be evacuated to meet the event reporting requirement? - ANSWER-30 minutes .Frequency Bias needs to be as close as practical to or _______ than the BA Frequency Response. - ANSWER-Bias setting must be equal to or GREATER than the frequency response

Content preview

NERC Test Questions With 100%
Correct Answers




it h
.A Reliability Adjustment Arranged Interchange must be approved by who? -
ANSWER-Only the source and sink, the key word to remember is Adjustment



.A TO must coordinate its load shedding plans, excluding UFLS, with who? -




w
ANSWER-Other interconnected TO and BA




ce
d
.According to EOP-002, what actions are acceptable in an operating capacity
or energy emergency by a BA? - ANSWER-Bringing on all available


ffi
te
generation, postponing equipment maintenance, scheduling interchange
purchases, and reduce firm load
iO
ea


.According to NERC, where should voltage be maintained during restoration?
- ANSWER-90 to 110 percent of Nominal
ob
Cr




.After a system modification is made, how long does the TO have to update
restoration plans? - ANSWER-90 days
M



.After how long does a complete loss of monitoring capability meet reporting
threshold? - ANSWER-30 minutes



.After how long must a complete loss of voice communications be reported? -
ANSWER-30 minutes

,.An RC backup control facility is not required to be available during what two
conditions? - ANSWER-Planned outages of two weeks or less; unplanned
outages




it h
.BA and RC are given responsibility and authority to make decisions to
alleviate what? - ANSWER-Capacity and energy emergencies



.BA not serving native load minimum frequency bias is based on... -




w
ANSWER-The montlhly average Frequency Bias is at least 1 % of the BA
estimated yearly peak generation per .1 Hz (Load = 1 % demand; No Load = 1




ce
% Gen)
d
ffi
te
.BA serving native load minimum frequency bias is based on... - ANSWER-The
monthly average Frequency Bias is at least 1% of the BA estimated yearly
peak demand per .1 Hz (Load = 1 % demand; No Load = 1 % Gen)
iO
ea


.By what means does an RC notify other RCs of a declared EEA? -
ANSWER-The RCIS - Reliability Coordinator Information System
ob
Cr




.Describe Attachment 1 and attachment 2 of EOP-004 Event Reporting: -
ANSWER-Att 1 is the events required to be reported; Att 2 is the Event
M



Reporting Form



.During an EEA 2 what must BA and market participants with resources do to
help? - ANSWER-Immediately contact the Energy Deficient Entity

, .Each BA and RC shall have the ____ and clear decision-making ____ to take
whatever actions are needed to ensure reliability of its respective area... -
ANSWER-responsibility and authority



.Each BA must report its Bias Setting and the method for determining it to
which entity? - ANSWER-NERC Operating Committee




it h
.Emergency plans are made for what three conditions? - ANSWER-Generating
Capacity loss, Transmission System loss, Load Shedding plans




w
ce
.Events meeting event report threshold: - ANSWER-Damage, destruction or
physical threats physical threats to a facility, physical threats to a control
d
center, public appeal for load reduction, system-wide voltage reduction >3%,



ffi
manual or automatic firm load shedding >100MW; voltage deviation +/- 10%
te
for 15 minutes; IROL or SOL violation, loss of Firm load, System separation
(islanding), generation loss, complete loss of offsite power to a nuclear plant,
transmission loss, control center evacuation, complete loss of voice comm or
iO
ea


monitoring capabilities
ob
Cr



.Following a Contingency or other event that results in an IROL violation, how
long does the TO have to bring the system back into limits? - ANSWER-As
soon as possible and not to exceed 30 minutes
M



.For how long must a BES control center be evacuated to meet the event
reporting requirement? - ANSWER-30 minutes



.Frequency Bias needs to be as close as practical to or _______ than the BA
Frequency Response. - ANSWER-Bias setting must be equal to or GREATER
than the frequency response

Document information

Uploaded on
February 23, 2025
Number of pages
30
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ryancodoc
3.5
(6)
Sold
33
Followers
11
Items
1706
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions