IMSA TRAFFIC TECH 1 QUESTIONS
WITH DETAILED ANSWERS
GRADE A+
What should you do first before preforming duties in the proximity of
overhead power lines ?
They must communicate with the power company prior to starting the work
and coordinate the activities that a representative of the power company
can be in attendance to assist while the work is being performed
True
Electrical lines buried underground present the same potential for danger
as overhead lines
,Typical equipment you use for a overhead traffic signal installationand
maintenance?
Typical equipment for above ground includes bucket trucks plat form lift
trucks boom trucks and cranes
Whenever a technician is on any type of aerial lift equipment
When should a full body Harness be worn
It straps around the legs and shoulder of the technician and is tethered to
the lift arm of the aerial equipment
Where does the Full body harness straps around ?
,The location of utilities that cannot be readily seen including what type they
are and the potential for danger that they possess.
Workers must be aware of what?
Notify all known utility owners prior to beginning excavation
The contractors should notify who before beginning excavation?
Gas and pressurized water and sewer lines.
What is the most common underground utilities that might be encountered
doing construction for traffic signals?
Need to ensure that the traveling public is safe
, Workers are responsible not only for ensuring their own safety in the work
environment but also?
Commonly known as maintenance of traffic plan
What is most commonly use besides traffic control plan ?
Maintenance of traffic plan
What's is MOT plan ?
True
Workzone signs need to be done regardless of how short the activity. Is
expected to be. True or false
WITH DETAILED ANSWERS
GRADE A+
What should you do first before preforming duties in the proximity of
overhead power lines ?
They must communicate with the power company prior to starting the work
and coordinate the activities that a representative of the power company
can be in attendance to assist while the work is being performed
True
Electrical lines buried underground present the same potential for danger
as overhead lines
,Typical equipment you use for a overhead traffic signal installationand
maintenance?
Typical equipment for above ground includes bucket trucks plat form lift
trucks boom trucks and cranes
Whenever a technician is on any type of aerial lift equipment
When should a full body Harness be worn
It straps around the legs and shoulder of the technician and is tethered to
the lift arm of the aerial equipment
Where does the Full body harness straps around ?
,The location of utilities that cannot be readily seen including what type they
are and the potential for danger that they possess.
Workers must be aware of what?
Notify all known utility owners prior to beginning excavation
The contractors should notify who before beginning excavation?
Gas and pressurized water and sewer lines.
What is the most common underground utilities that might be encountered
doing construction for traffic signals?
Need to ensure that the traveling public is safe
, Workers are responsible not only for ensuring their own safety in the work
environment but also?
Commonly known as maintenance of traffic plan
What is most commonly use besides traffic control plan ?
Maintenance of traffic plan
What's is MOT plan ?
True
Workzone signs need to be done regardless of how short the activity. Is
expected to be. True or false