100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK EXAM NEWEST 2025 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
19-02-2025
Written in
2024/2025

CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK EXAM NEWEST 2025 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED

Institution
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK
Course
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK
Course
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK

Document information

Uploaded on
February 19, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK EXAM NEWEST 2025 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT
DETAILED



The Class A and Class B certification must be renewed every: - (ANSWER)5 years

UST financial responsibility requirements apply to what? - (ANSWER)600 gallon used oil tank

Secondary Containment is required for what? - (ANSWER)New UST Systems, Piping in contact with the ground,
and Replacement UST

A Class A operator shall maintain the records of UST site inspections for a *minimum* of: - (ANSWER)3 years

New owners of an existing UST system shall register the UST system with DEQ/LARA within what period from
date of ownership? - (ANSWER)30 days

UST systems with cathodic protection should be inspected for proper operation by a qualified cathodic protection
tester on the following schedule: - (ANSWER)Every three years

UST systems with impressed current cathodic protection systems must be inspected at a minimum: -
(ANSWER)Every 60 days

Within what period after a repair should a cathodically protected UST system be tested to ensure it is working
properly? - (ANSWER)6 months

Pressurized underground piping that routinely contains regulated substances shall be monitored for releases in a
manner that meets what requirements? - (ANSWER)Be equipped with a line leak detector, and have an annual
line tightness test

A suspected release must be confirmed to the DEQ/LARA within: - (ANSWER)7 days

What actions are required in MUSTR when there is a spill or overfil of petroleum or hazardouz substances that
result in a release into groundwater, surface water, or substance soils? - (ANSWER)Notify DEQ/LARA of a
confirmed release, Immediately clean up the spill or overfill, and Contain the spill

To permanently close a tank, an owner and operator shall: - (ANSWER)Remove the tank from the ground, Fill
with an inert solid if removal jeopardizes the building structure integrity, and Empty and clean the tank by
removing all liquids and accumulated sludge and purge it of all vapors

If you have 100 or fewer tanks, financial responsibility is required in the aggregate the amount of: -
(ANSWER)$1 Million

Petroleum marketers are required to have finanical responsibility to cover X dollars per occurence. X is.... -
(ANSWER)$1 Million

Can an owner use pollution liability insurance as a means of financial responsibility? - (ANSWER)Yes

An automatic tank gauge must be able to detect a leak of X gallons per hour. X is: - (ANSWER)0.2 gallons per
hour

Statistical Inventory reconciliation (SIR) analyzes the following as a means of leak detection: -
(ANSWER)Inventory, Delivery and Dispensing

Manual tank gauging can be used as the 'sole' means of a leak detection for tanks that are X gallons or less in
1/5

, CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK EXAM NEWEST 2025 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT
DETAILED



capacity. X is: - (ANSWER)550 gallons

Check if the following statement is true or false: "A third party evaluation of a statistical inventory reconciliation
is good for any type of tank and product." - (ANSWER)False

Automatic line leak detectors must be able to detect a leak of at least X gallons per hour at a line pressure of 10
psi witin one hour. X is: - (ANSWER)3 gallons per hour

Line testing of piping shall be capable of detecting X gallons per hour leak rate at 1 and a half times the operating
pressure. X is: - (ANSWER)0.1 gallons per hour

What actions are not appropriate when when the owner/operator becomes aware of a spill or overfill? -
(ANSWER)Drain the spill to the storm sewer or nearby ditch

Upon confirmation of a release to the soil/groundwater/surface water the operator shall: - (ANSWER)Report the
release to the DEQ within 24 hours, by fax or phone

A Class B operator shall not be responsible for more than the following facilities: - (ANSWER)45 facilities

What is the minimum frequency of site inspections to assure operational compliance? - (ANSWER)Quarterly

If a facility has been determined by the DEQ inspector to be out of compliance with the significant operational
compliance requirements, the DEQ shall retrain: - (ANSWER)The class A operator of the facility

When planning to permanently close a UST system, the DEQ must be notified not less than: - (ANSWER)30 days

Upon permanent Removal of an UST system, the operator shall: - (ANSWER)Notify the DEQ within 30 days
with an amended registration form

The operator shall notify the DEQ of a confirmed release upon removal of an UST and visual evidence showing: -
(ANSWER)Either there is visibly contaminated groundwater in the tank cavity or there is visibly contaminated
soil in the tank cavity and/or soil removed from the tank cavity

Upon removal of an UST where there is no visual or olfactoryevidence of a release , the operator shall: -
(ANSWER)Take soil samples, analyze them, and then send the site assessment results to the DEQ for a
determination

A leak should be suspected in 1,560 gallon tank if the variation between the beginning and ending manual tank
gauging liquid level measurements exceeds the weekly standard of X gallons. X is: - (ANSWER)26 gallons

The class B operator should inspect the UST system for operational compliance status at a minimum: -
(ANSWER)Every quarter

Release detection records of sampling, testing, or monitoring shall be maintained for: - (ANSWER)2 years

When a tank that has been installed for less than 10 years is upgraded with the cathodic protection, tightness
test(s) are required as follows: - (ANSWER)Tightness tests should be conducted before the installation of
cathodic protection and 3-6 months after the installation of the cathodic protection

UST systems with impressed current cathodic protection systems must also be inspected at a minimum of: -
2/5

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QuickFixer Self
View profile
Follow You need to be logged in order to follow users or courses
Sold
2066
Member since
2 year
Number of followers
7
Documents
1181
Last sold
3 weeks ago

3.6

18 reviews

5
6
4
3
3
6
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions