100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

On-Site Sewage Contractor Exam Final Exam And Correct Answers.

Rating
-
Sold
1
Pages
5
Grade
A+
Uploaded on
19-02-2025
Written in
2024/2025

Absorption field lengths are determined - Answer by the # of bedrooms in a home or estimated gallon per day water usage Absorption field depths are determined by - Answer the soil conditions on the property From wells to springs - Answer a minimum of 50' from septic tanks and a minimum of 100' from absorption fields From property lines served by the public - Answer a minimum of 10' from septic tanks and a minimum of 5' from the absorption fields From property lines served by individual - Answer absorption lines must be 50' from adjacent property unless development is preplanned From bodies of water or impoundments - Answer minimum of 25' from septic tanks and min 50' from absorption fields From streams or tributaries - Answer a min of 25' from septic tanks and a min of 50' from absorption fields From ponded wetlands - Answer a minimum of 50' for absorption fields Building with a basement - Answer septic tank and absorption fields a minimum of 10' from foundation From a drainage ditch, trash pits, and embankments - Answer 15 feet

Show more Read less
Institution
OSSF DR
Course
OSSF DR









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
OSSF DR
Course
OSSF DR

Document information

Uploaded on
February 19, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

On-Site Sewage Contractor Exam Final
Exam And Correct Answers.

Absorption field lengths are determined - Answer by the # of bedrooms in a home or estimated gallon
per day water usage



Absorption field depths are determined by - Answer the soil conditions on the property



From wells to springs - Answer a minimum of 50' from septic tanks and a minimum of 100' from
absorption fields



From property lines served by the public - Answer a minimum of 10' from septic tanks and a minimum
of 5' from the absorption fields



From property lines served by individual - Answer absorption lines must be 50' from adjacent property
unless development is preplanned



From bodies of water or impoundments - Answer minimum of 25' from septic tanks and min 50' from
absorption fields



From streams or tributaries - Answer a min of 25' from septic tanks and a min of 50' from absorption
fields



From ponded wetlands - Answer a minimum of 50' for absorption fields



Building with a basement - Answer septic tank and absorption fields a minimum of 10' from foundation



From a drainage ditch, trash pits, and embankments - Answer 15 feet

, If the water supply crosses or comes within 10 feet of the absorption field - Answer the water supply
line shall be installed at least 12 inches above the top of the aggregate layer of the absorption field line
and shall be encased in single-length larger diameter



After the permit has been issued - Answer any grading, filling or other site modifications that would
adversely affect the system will render the permit void



the first component of an on-site sewage management system - Answer the septic tank



Septic tanks are generally pre-cast with - Answer concrete and delivered to the site. They can also be
poured in place when necessary



Septic tanks must have 2 compartments with the first - Answer designed to contain at least 2/3 of the
total liquid capacity of the tank



Septic tanks may be constructed from material of than concrete only when - Answer approved by the
department's technical review committee



Regardless of the tank construction the minimum liquid capacity of a septic tank for one, two, three or
four bedroom homes - Answer shall not be less than 1,000 gallon



For each additional bedroom over 4 - Answer the septic tank capacity shall increase by 250 gallons



When garbage grinders are used - Answer septic tank capacity shall be increased by 50%



The primary purpose of a septic tank is to - Answer provide a means of settling out solid matter from
the liquid



By design the outlet of a septic tank should be - Answer two inches lower than the inlet



Once installed, the tank should have a - Answer minimum of 6 inches of cover

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9 Webster University
View profile
Follow You need to be logged in order to follow users or courses
Sold
760
Member since
2 year
Number of followers
126
Documents
25263
Last sold
3 hours ago
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

136 reviews

5
61
4
19
3
22
2
10
1
24

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions