ACI GRADE 1 WRITTEN EXAM LATEST REAL
EXAM 200 QUESTIONS AND CORRECT
ANSWERS | LATEST VERSION (2025) | GRADED
A+
Save
Terms in this set (206)
Sampling by this practice Compliance
covers procedures for
obtaining representative
samples, on which tests
are to be performed to
determine ___ with quality
requirements of the
specifications listed
under which the concrete
is furnished (C172/C172M-
17 = Sampling Freshly
Mixed Concrete)
This practice covers Stationary, paving, revolving drum, continous, and
sampling from five types open top mixers
of equipment which are...
(C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
https://quizlet.com/1004976772/aci-grade-1-written-exam-latest-real-exam-200-questions-and-correct-answers-latest-version-2025-graded-a-flash-ca… 1/26
,2/12/25, 11:58 AM ACI GRADE 1 WRITTEN EXAM LATEST REAL EXAM 200 QUESTIONS AND CORRECT ANSWERS | LATEST VERSION (2025)…
The elapsed time 15 mins
between obtaining the
first and final portions of
a composite sample shall
not exceed...
(C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
T or F: Portions of a True
composite sample shall
be thoroughly remixed
before beginning tests on
the sample (C172/C172M-
17 = Sampling Freshly
Mixed Concrete)
Start tests for slump, 5
temperature, and air
content within ___ after
obtaining the final
portion of the composite
sample (C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
Start molding specific 15
ends for strength tests
within ___ after fabricating
the composite sample
(C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
https://quizlet.com/1004976772/aci-grade-1-written-exam-latest-real-exam-200-questions-and-correct-answers-latest-version-2025-graded-a-flash-ca… 2/26
, 2/12/25, 11:58 AM ACI GRADE 1 WRITTEN EXAM LATEST REAL EXAM 200 QUESTIONS AND CORRECT ANSWERS | LATEST VERSION (2025)…
The concrete sample Rapid evaporation (also sun and wind)
must be protected from
contamination and ...
(C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
The minimum size sample 28 L (aka 1 ft3)
for making strength test
specimens is ...
(C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
When sampling from a 2
stationary mixer, the
batch must be sampled at
___ or more regularly
spaced intervals during
discharge of the middle
portion of the batch
(C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
When sampling from a 5
paving mixer, obtain
samples from at least ___
different portions of the
pile and combine them
into one composite
sample for test purposes
(C172/C172M-17 =
Sampling Freshly Mixed
Concrete)
https://quizlet.com/1004976772/aci-grade-1-written-exam-latest-real-exam-200-questions-and-correct-answers-latest-version-2025-graded-a-flash-ca… 3/26