What does the acronym NPDES stand for? - (correct answer) -National Pollutant Discharge Elimination System
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
municipal separate storm drain system, to waters of the US. - (correct answer) -2.1.1.6
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
True
What does the acronym TMDL stand for? Define it? - (correct answer) -2.1.1.10
miu miu miu miu miu miu miu miu miu miu miu miu miu
Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
without violating applicable water quality standards.
miu miu miu miu miu miu
Define TMDL - (correct answer) -2.1.1.10
miu miu miu miu miu miu
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
violating applicable water quality standards. (Water quality standards usually predetermined by the state.)
miu miu miu miu miu miu miu miu miu miu miu miu miu
What are the two types of storm-water permits issued under the NPDES Program? - (correct answer) -2.2.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
1. The Construction General Permit (CGP).
miu miu miu miu miu
2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - (correct answer)
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
-No later than seven days after the inspection.
miu miu miu miu miu miu miu miu
List three types of pollutants. - (correct answer) -2.1
miu miu miu miu miu miu miu miu
Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances.
miu miu miu miu miu miu miu miu miu
List three examples of 'Waters of the United States'. - (correct answer) -2.1.1.6
miu miu miu miu miu miu miu miu miu miu miu miu
Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural
miu miu miu miu miu miu miu miu miu miu miu miu miu
ponds.
miu
When does the SWPPP need to be completed? - (correct answer) -2.3.6.4
miu miu miu miu miu miu miu miu miu miu miu
Prior to submitting the NOI.
miu miu miu miu
When does the EPA's construction permit require inspections? - (correct answer) -Every 7 days, or within 24 hrs of
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
a storm of 0.5 inches or move in depth.
miu miu miu miu miu miu miu miu miu
What does CPESC stand for? - (correct answer) -Certified Professional in Erosion & Sediment Control
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
What are the two types of Storm Water Permits? - (correct answer) -2.2.1
miu miu miu miu miu miu miu miu miu miu miu miu miu
1. General: provides umbrella coverage to a large number of applicants.
miu miu miu miu miu miu miu miu miu miu
miu 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
obtain a permit for the 1/2 acre. - (correct answer) -2.1.1.8
miu miu miu miu miu miu miu miu miu miu miu
False, If it as part of a larger plan of development >1 acre, a permit is required.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - (correct answer) -2.1.1.2
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
-Facilities already covered by a permit miu miu miu miu miu
-Facilities that engage in industrial activity miu miu miu miu miu
-Large (>250K pop) MS4s miu miu miu
-Medium (100K250K) MS4s miu miu
-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
miu miu miu miu miu miu miu miu miu miu
, Who is responsible for applying for the Storm water permit for a construction site? - (correct answer) -2.3.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
The operator of the site, however a owner can apply if the operator has not been identified.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
What is an NOI? - (correct answer) -2.2.4
miu miu miu miu miu miu miu
"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
List the 6 major phases of a SWPPP for construction activities? - (correct answer) -2.3.6
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
-Site Evaluation/design development (site plan)
miu miu miu miu
-Assessment (site area/runoff calc) miu miu miu
-Control selection and plan design (BMPs) miu miu miu miu miu
-Certification/notification (NOI) miu
-Construction/implementation (install/maintenance) miu
-Final stabilization/termination (NOT)
miu miu
What score do you need to pass each section of the test? - (correct answer) -70%
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
What is the deadline to stabilize a site that wont be redisturbed? - (correct answer) -2.3.6.3
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
14 days miu
What is the deadline to correct problems found during an inspection? - (correct answer) -2.3.6.5
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
As soon as possible but no later than 7 days.
miu miu miu miu miu miu miu miu miu
How long do you have to keep copies of the swppp after final stabilization? - (correct answer) -2.3.6.5 (second to
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
last paragraph)
miu miu miu
3 years
miu
What are the 3 types of enforcement actions EPA has? - (correct answer) -2.3.7
miu miu miu miu miu miu miu miu miu miu miu miu miu
-Administrative Orders miu
-Civil Actions miu
-Criminal Prosecutions miu
The Federal Water Pollution Control Act was established which year? - (correct answer) -1948
miu miu miu miu miu miu miu miu miu miu miu miu miu
When was the Federal Water Pollution Control Act amended? What is it called now? - (correct answer) -2.1.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
1972 and 1977. Now called the Clean Water Act
miu miu miu miu miu miu miu miu
Which year was the National Pollutant Discharge Elimination System established? - (correct answer) -2.1.1.2
miu miu miu miu miu miu miu miu miu miu miu miu miu
1972
What is an MS4? - (correct answer) -Municipal Separate Storm Sewer System
miu miu miu miu miu miu miu miu miu miu miu
Stormwater is defined under EPA's NPDES rules as . . . - (correct answer) -2.1.1.5
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
Stormwater runoff, snow melt runoff, and surface runoff and drainage.
miu miu miu miu miu miu miu miu miu
Who is allowed to certify the SWPPP? - (correct answer) -The authorized representative of the site operator, such
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
as the president, vice president, or a general partner who has been delegated authority to sign and certify this type
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
of document.
miu miu
Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - (correct answer) -* Integrity
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
* Objectivity
miu
* Confidentiality
miu
* Competence
miu
* Professionalism
miu
Who oversees Stormwater Regulations ? - (correct answer) -EPA (US Environmental Protection Agency)
miu miu miu miu miu miu miu miu miu miu miu miu
When was the Stormwater Application Rule issued? - (correct answer) -November 16th, 1990
miu miu miu miu miu miu miu miu miu miu miu miu
When was the Stormwater Implementation Rule enacted and what did it entail? - (correct answer) -April 1992;
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
minimum requirements for storm water permit terms and conditions
miu miu miu miu miu miu miu miu miu
Answers Latest Update
What does the acronym NPDES stand for? - (correct answer) -National Pollutant Discharge Elimination System
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
municipal separate storm drain system, to waters of the US. - (correct answer) -2.1.1.6
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
True
What does the acronym TMDL stand for? Define it? - (correct answer) -2.1.1.10
miu miu miu miu miu miu miu miu miu miu miu miu miu
Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
without violating applicable water quality standards.
miu miu miu miu miu miu
Define TMDL - (correct answer) -2.1.1.10
miu miu miu miu miu miu
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
violating applicable water quality standards. (Water quality standards usually predetermined by the state.)
miu miu miu miu miu miu miu miu miu miu miu miu miu
What are the two types of storm-water permits issued under the NPDES Program? - (correct answer) -2.2.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
1. The Construction General Permit (CGP).
miu miu miu miu miu
2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - (correct answer)
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
-No later than seven days after the inspection.
miu miu miu miu miu miu miu miu
List three types of pollutants. - (correct answer) -2.1
miu miu miu miu miu miu miu miu
Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances.
miu miu miu miu miu miu miu miu miu
List three examples of 'Waters of the United States'. - (correct answer) -2.1.1.6
miu miu miu miu miu miu miu miu miu miu miu miu
Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural
miu miu miu miu miu miu miu miu miu miu miu miu miu
ponds.
miu
When does the SWPPP need to be completed? - (correct answer) -2.3.6.4
miu miu miu miu miu miu miu miu miu miu miu
Prior to submitting the NOI.
miu miu miu miu
When does the EPA's construction permit require inspections? - (correct answer) -Every 7 days, or within 24 hrs of
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
a storm of 0.5 inches or move in depth.
miu miu miu miu miu miu miu miu miu
What does CPESC stand for? - (correct answer) -Certified Professional in Erosion & Sediment Control
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
What are the two types of Storm Water Permits? - (correct answer) -2.2.1
miu miu miu miu miu miu miu miu miu miu miu miu miu
1. General: provides umbrella coverage to a large number of applicants.
miu miu miu miu miu miu miu miu miu miu
miu 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
obtain a permit for the 1/2 acre. - (correct answer) -2.1.1.8
miu miu miu miu miu miu miu miu miu miu miu
False, If it as part of a larger plan of development >1 acre, a permit is required.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - (correct answer) -2.1.1.2
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
-Facilities already covered by a permit miu miu miu miu miu
-Facilities that engage in industrial activity miu miu miu miu miu
-Large (>250K pop) MS4s miu miu miu
-Medium (100K250K) MS4s miu miu
-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
miu miu miu miu miu miu miu miu miu miu
, Who is responsible for applying for the Storm water permit for a construction site? - (correct answer) -2.3.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
The operator of the site, however a owner can apply if the operator has not been identified.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
What is an NOI? - (correct answer) -2.2.4
miu miu miu miu miu miu miu
"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
List the 6 major phases of a SWPPP for construction activities? - (correct answer) -2.3.6
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
-Site Evaluation/design development (site plan)
miu miu miu miu
-Assessment (site area/runoff calc) miu miu miu
-Control selection and plan design (BMPs) miu miu miu miu miu
-Certification/notification (NOI) miu
-Construction/implementation (install/maintenance) miu
-Final stabilization/termination (NOT)
miu miu
What score do you need to pass each section of the test? - (correct answer) -70%
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
What is the deadline to stabilize a site that wont be redisturbed? - (correct answer) -2.3.6.3
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
14 days miu
What is the deadline to correct problems found during an inspection? - (correct answer) -2.3.6.5
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
As soon as possible but no later than 7 days.
miu miu miu miu miu miu miu miu miu
How long do you have to keep copies of the swppp after final stabilization? - (correct answer) -2.3.6.5 (second to
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
last paragraph)
miu miu miu
3 years
miu
What are the 3 types of enforcement actions EPA has? - (correct answer) -2.3.7
miu miu miu miu miu miu miu miu miu miu miu miu miu
-Administrative Orders miu
-Civil Actions miu
-Criminal Prosecutions miu
The Federal Water Pollution Control Act was established which year? - (correct answer) -1948
miu miu miu miu miu miu miu miu miu miu miu miu miu
When was the Federal Water Pollution Control Act amended? What is it called now? - (correct answer) -2.1.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
1972 and 1977. Now called the Clean Water Act
miu miu miu miu miu miu miu miu
Which year was the National Pollutant Discharge Elimination System established? - (correct answer) -2.1.1.2
miu miu miu miu miu miu miu miu miu miu miu miu miu
1972
What is an MS4? - (correct answer) -Municipal Separate Storm Sewer System
miu miu miu miu miu miu miu miu miu miu miu
Stormwater is defined under EPA's NPDES rules as . . . - (correct answer) -2.1.1.5
miu miu miu miu miu miu miu miu miu miu miu miu miu miu
Stormwater runoff, snow melt runoff, and surface runoff and drainage.
miu miu miu miu miu miu miu miu miu
Who is allowed to certify the SWPPP? - (correct answer) -The authorized representative of the site operator, such
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
as the president, vice president, or a general partner who has been delegated authority to sign and certify this type
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
of document.
miu miu
Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - (correct answer) -* Integrity
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
* Objectivity
miu
* Confidentiality
miu
* Competence
miu
* Professionalism
miu
Who oversees Stormwater Regulations ? - (correct answer) -EPA (US Environmental Protection Agency)
miu miu miu miu miu miu miu miu miu miu miu miu
When was the Stormwater Application Rule issued? - (correct answer) -November 16th, 1990
miu miu miu miu miu miu miu miu miu miu miu miu
When was the Stormwater Implementation Rule enacted and what did it entail? - (correct answer) -April 1992;
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu
minimum requirements for storm water permit terms and conditions
miu miu miu miu miu miu miu miu miu