100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

GE CCC Exam with Answers 100% Correct

Rating
-
Sold
-
Pages
24
Grade
A+
Uploaded on
30-01-2025
Written in
2024/2025

GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct

Show more Read less
Institution
GE CCC
Course
GE CCC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
GE CCC
Course
GE CCC

Document information

Uploaded on
January 30, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

GE CCC Exam with answErs 100% CorrECt
Define: General Engineering ✔✔ Those engineering capabilities and activities, other than combat
engineering, that modify, maintain, or protect the physical environment.



Examples include: the construction, repair, maintenance, and operation of infrastructure, facilities, lines
of communication and bases; terrain modification and repair; and selected explosive hazards activities.

(ATP 3-34.40 General Engineering)

Two Levels of Quality Control (QC) ✔✔ 1. Unit - The unit's QC manager and assigned QC specialists
perform and direct activities to execute the unit-level QC program.



2. Project - Project managers and project supervisors perform and direct activities to develop an
individual project QC plan.



Inspections ✔✔ Vital Part of Controlling Quality



• Measure performance against a standard



• Determine the magnitude of the problem(s)



• Seek the root cause(s) of the problem(s)



• Determine a solution



• Assign responsibility to the appropriate individuals or agencies



Reports ✔✔ Reports should list, for each phase of control, the factual results of control actions taken,
observations made, and any remedial and corrective actions.



The frequency of reporting or time for submitting reports must be indicated on the Quality Control Plan

,Performance Work Statement ✔✔ •Keys to a good PWS:

1) Use performance based language

2) Prevent contractor shortcuts

3) Prevent contractor shortcuts.



•Altering the contract costs a lot more money, effort and time than doing it right the first time.



All elements of: Construction Activity (JCMS) ✔✔ 1. NSN's



2. Resources



3. Drawings



4. Support Files



5. TOGs (Theater Oriented Guide Specifications)

- Describe the processes, procedures and construction standard for the associated sequence.

- Ex. Masonry specifications



Power Law



P = ? ✔✔ P = I * E



P (watts) = I (amps) * E (volts)



1 hp = ____ watts ✔✔ 746 watts = 1 hp



Ohm's Law

, R = ? ✔✔ R (ohms) = E / I



Demand Load ✔✔ Demand Load = Total Connected Load * Demand Factor



DL = CL * DF



% Motor Load ✔✔ %ML = (TML/TDL)*100



% ML = ( Total Motor Load (kW) / Total Demand Load (kw)) * 100



Generator Capacity ✔✔ Generator Capacity = Total Demand Load * Generator Factor



GC = TDL * GF



Generator Load Balancing



Determine if the loads are within 10% ✔✔ I (min) * 1.10 > I (max)



Construction Projects can be broken down into three types: ✔✔ - Permanent

• Life expectancy greater than 25 years

• Low maintenance cost

• Only executed by USACE



- Semi-permanent

• Life expectancy between 5 and 25 years

• Only executed by USACE

• Troop construction may be used

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Solution001Master Liberty
View profile
Follow You need to be logged in order to follow users or courses
Sold
144
Member since
4 year
Number of followers
108
Documents
3924
Last sold
3 weeks ago
BEST TESTBANK WOLRD

Welcome to the home of all new and latest updated Test Banks,study Guide And Exams All at affordable prizes . Thank You and all the best as you study

3.7

33 reviews

5
13
4
6
3
9
2
0
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions