S-130 Exam Review Questions and Answers
What are the sections in the IRPG? - Correct Answers -1. Green- operational
engagement
2. Gray- specific hazards
3. Yellow- all hazard responses
4. Blue- aviation
5. White- other references
6. Red- emergency medical care.
Safety Zone - Correct Answers -an area where a firefighter can survive w/out a fire
shelter.
Wx Factors - Correct Answers -atmospheric stability
inversions
strong and shifting winds
high temp
low RH
Fire Triangle - Correct Answers -fuel, oxygen, heat
Fire Shelter - Correct Answers -Personal protective equipment designed to provide last
resort protection for a firefighter trapped by wildland fire
Fire Shelter Functions - Correct Answers -1. to reflect radiant heat NOT direct flame
2. provides cooler, breathable air to protect the lungs and airways.
Risk Management Process - Correct Answers -1. SA
2. Hazard Assessment
3. Hazard Control
4. Decision Point
5. Evaluate
Risk Management - Correct Answers -using strategies to reduce the amount of risk (the
degree of likelihood that a person will become ill upon exposure to a toxin or pathogen).
Report to ? - Correct Answers -IC- Crew boss/Squad Boss/FFI/ FFII
ICS system - Correct Answers -1. management tool for responding to emergency
situations and adaptable to any size/type.
What are the sections in the IRPG? - Correct Answers -1. Green- operational
engagement
2. Gray- specific hazards
3. Yellow- all hazard responses
4. Blue- aviation
5. White- other references
6. Red- emergency medical care.
Safety Zone - Correct Answers -an area where a firefighter can survive w/out a fire
shelter.
Wx Factors - Correct Answers -atmospheric stability
inversions
strong and shifting winds
high temp
low RH
Fire Triangle - Correct Answers -fuel, oxygen, heat
Fire Shelter - Correct Answers -Personal protective equipment designed to provide last
resort protection for a firefighter trapped by wildland fire
Fire Shelter Functions - Correct Answers -1. to reflect radiant heat NOT direct flame
2. provides cooler, breathable air to protect the lungs and airways.
Risk Management Process - Correct Answers -1. SA
2. Hazard Assessment
3. Hazard Control
4. Decision Point
5. Evaluate
Risk Management - Correct Answers -using strategies to reduce the amount of risk (the
degree of likelihood that a person will become ill upon exposure to a toxin or pathogen).
Report to ? - Correct Answers -IC- Crew boss/Squad Boss/FFI/ FFII
ICS system - Correct Answers -1. management tool for responding to emergency
situations and adaptable to any size/type.