JTIDS- Post Test 5 Questions With Correct
Answers 100% Verified.
Data Registration is ___________. - Answer✔a condition of correct relative alignment between
local and remote track positional data
*OR*
used to prevent an individual IU data base from being overloaded
The JTDC is responsible to the Joint Interface Control Officer (JICO) for: - Answer✔The clarity,
accuracy, currency and quality of the MTN tactical picture
When a platform is ready to enter the MTA, it can simply turn on the equipment and broadcast
without prior coordination? - Answer✔False
_________ produce and transmit surveillance tracks. - Answer✔C2IUs
_______ exist when the same track number is used by two or more IUs for two or more different
tracks. - Answer✔Dual designations
*OR*
Duplicate track numbers
What TDL can the A-10C operate? - Answer✔SADL
_______ is a numerical value that represents the horizontal positional reliability within a 95
percent confidence level and serves to give operators a sense of how accurate the track is, as well
as the basis for R2 and correlation. - Answer✔Track Quality
If a TN is in use, operators should be alerted and prohibited from assigning that TN. -
Answer✔True
_______ is the requirement for the IU with the best positional data on a track to transmit track
data on the interface. - Answer✔Reporting Responsibility (R2)
The only tracks that can?t be manually correlated are: Select all that apply. - Answer✔Simulated
to live
Two remote tracks
Different environments of track with active environment conflict