An impairment coordinating is the person responsible to notify the fire department about an out-of-service fire protection system condition. Who should legally designate the impairment coordinator?.. - ANSWER the building owner Select the correct statement regarding battery systems. (refer to the reference table) - ANSWER The B-29 Certificate of fitness holder is responsible to perform periodically visual inspection of the battery system Who is responsible to maintain the pre-hot work check record? - ANSWER the responsible person for the hot work Phase 1 elevator emergency recall operation must be activated______. - ANSWER automatically when smoke detectors or the sprinkler waterflow alarms are activated Select the correct statement regarding the record keeping of refrigeration system operation. - ANSWER The logbook must include entries of any operating problems or deficiencies, and required periodic tests conducted Which of the following building occupancies requires an EPA director to implement the emergency action plan? - ANSWER An office building greater then 75 feet high The only Q-01 certificate of qualification holder on duty in the building is asked by the Chief Engineer to leave the building to purchase a plumping tool. what immediate action should the Q-01 certificate of qualification holder take consistent with the new york city fire code? - ANSWER Not leave the building when the refrigerating system is in operation The sprinkler system in a machinery room containing a refrigerating system is out of service. under this condition, hot work operations_____. - ANSWER Are prohibited in that area Transfer switches of the emergency power system must be tested semiannually. which is th

Show more Read less
Institution
BOMR
Module
BOMR









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BOMR
Module
BOMR

Document information

Uploaded on
January 26, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

BOMR EXAM QUESTIONS AND
ANSWERS 100% CORRECT!

, Insecticidal fogging operations are hazardous because the chemicals... - ANSWER May
be toxic

A fire watch must be provided when a(n)____ is out of service - ANSWER standpipe
systems

An impairment coordinating is the person responsible to notify the fire department about
an out-of-service fire protection system condition. Who should legally designate the
impairment coordinator?.. - ANSWER the building owner

Select the correct statement regarding battery systems. (refer to the reference table) -
ANSWER The B-29 Certificate of fitness holder is responsible to perform periodically
visual inspection of the battery system

Who is responsible to maintain the pre-hot work check record? - ANSWER the
responsible person for the hot work

Phase 1 elevator emergency recall operation must be activated______. - ANSWER
automatically when smoke detectors or the sprinkler waterflow alarms are activated

Select the correct statement regarding the record keeping of refrigeration system
operation. - ANSWER The logbook must include entries of any operating problems or
deficiencies, and required periodic tests conducted

Which of the following building occupancies requires an EPA director to implement the
emergency action plan? - ANSWER An office building greater then 75 feet high

The only Q-01 certificate of qualification holder on duty in the building is asked by the
Chief Engineer to leave the building to purchase a plumping tool. what immediate action
should the Q-01 certificate of qualification holder take consistent with the new york city
fire code? - ANSWER Not leave the building when the refrigerating system is in
operation

The sprinkler system in a machinery room containing a refrigerating system is out of
service. under this condition, hot work operations_____. - ANSWER Are prohibited in
that area

Transfer switches of the emergency power system must be tested semiannually. which
is the correct statement regarding the testing procedure? - ANSWER electrically
operate the switch from the standard position to the alternate position and then return
back to the standard position.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Luckyexams Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
24
Member since
1 year
Number of followers
2
Documents
1744
Last sold
2 weeks ago

3.6

5 reviews

5
2
4
1
3
1
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions