Which of the following construction phases are documented in the
Seabee Project Package?
A. Initial planning.
B. Execution.
C. Closeout.
D. All of the above. - Correct Answers ✅D. All of the above.
(ref: NAVEDTRA 14081A, Ch 6, 1.0.0)
Which of the following disadvantages occur when utility lines are
ripped up?
A. Loss of project time.
B. Increased project cost.
C. People supported by the utilities are inconvenienced.
D. All of the above. - Correct Answers ✅D. All of the above.
(ref: NAVEDTRA 14081A, Ch 6, 1.1.4)
Earthwork computations are the calculations of earthwork volumes
used to determine which of the following factors?
A. The final grade.
B. The balanced cut and fill.
, Equipment Operator Basic - Earthwork
Operations - Ch 6 - EO Advancement Study
Flashcards EXAMS
C. A plan for the most economical movement of material.
D. All of the above. - Correct Answers ✅D. All of the above.
(ref: NAVEDTRA 14081A, Ch 6, 2.0.0)
What term is used to describe a selected layer of well-compacted soil
that is placed in compacted lifts on top of the subgrade?
A. Crown.
B. Base course.
C. Surface course.
D. Backslope. - Correct Answers ✅B. Base course.
(ref: NAVEDTRA 14081A, Ch 6, 2.2.3)
Which of the following describes grade work?
A. Making cuts or fills with any limit of grade and alignment.
B. Making cuts or fills to a definite limit alignment of grade and
alignment.
C. Aligning survey stakes on a construction project.
D. Taking the ground irregularities of a project and plotting them on a
blueprint. - Correct Answers ✅B. Making cuts or fills to a definite limit
alignment of grade and alignment.
(ref: NAVEDTRA 14081A, Ch 6, 3.0.0)
Operations - Ch 6 - EO Advancement Study
Flashcards EXAMS
Which of the following construction phases are documented in the
Seabee Project Package?
A. Initial planning.
B. Execution.
C. Closeout.
D. All of the above. - Correct Answers ✅D. All of the above.
(ref: NAVEDTRA 14081A, Ch 6, 1.0.0)
Which of the following disadvantages occur when utility lines are
ripped up?
A. Loss of project time.
B. Increased project cost.
C. People supported by the utilities are inconvenienced.
D. All of the above. - Correct Answers ✅D. All of the above.
(ref: NAVEDTRA 14081A, Ch 6, 1.1.4)
Earthwork computations are the calculations of earthwork volumes
used to determine which of the following factors?
A. The final grade.
B. The balanced cut and fill.
, Equipment Operator Basic - Earthwork
Operations - Ch 6 - EO Advancement Study
Flashcards EXAMS
C. A plan for the most economical movement of material.
D. All of the above. - Correct Answers ✅D. All of the above.
(ref: NAVEDTRA 14081A, Ch 6, 2.0.0)
What term is used to describe a selected layer of well-compacted soil
that is placed in compacted lifts on top of the subgrade?
A. Crown.
B. Base course.
C. Surface course.
D. Backslope. - Correct Answers ✅B. Base course.
(ref: NAVEDTRA 14081A, Ch 6, 2.2.3)
Which of the following describes grade work?
A. Making cuts or fills with any limit of grade and alignment.
B. Making cuts or fills to a definite limit alignment of grade and
alignment.
C. Aligning survey stakes on a construction project.
D. Taking the ground irregularities of a project and plotting them on a
blueprint. - Correct Answers ✅B. Making cuts or fills to a definite limit
alignment of grade and alignment.
(ref: NAVEDTRA 14081A, Ch 6, 3.0.0)