100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Cesswi Exam Questions and Answers 100% Pass

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
23-01-2025
Written in
2024/2025

Cesswi Exam Questions and Answers 100% Pass Certified erosion sediment and stormwater inspector - CESSWI Offers no mitigation - Ignorance Controls water pollution by regulating point sources that discharge pollutants into waters of the US - NPDES National pollutant discharge elimination system MS4 - Municipal Separate Storm Sewer System ESCP - Erosion and sediment control plan Has regulatory authority over the cwa - EPA Return flow from irrigated agriculture or their run off - Does not apply to the storm water term Only directly to. Or though a separate storm water system into us waters only - NPDES REQUIREMENTS Commercial, retail, light industrial and institutional facilities. Less than 5 acres 2Katelyn Whitman, All Rights Reserved © 2025 MS4 serving fewer than 100k people - Phase II Agriculture is exempt only for - Crop production O&G, forestry, and agriculture discharges are - Exempt Waiver "construction rainfall erosivity waiver" from phase II requirements under 2 conditions - Low rainfall potential Based on TMDL *only for small sites Triennial review process - States required to review and revise if necessary Umbrella coverage - General Permit Identifies potential sources of pollution that may effect storm water discharges. Describes management practices that are to be implemented to reduce pollutants discharges in stormwater - SWPPP NOI - Brief description of project Estimated timetable for major activities Estimated disturbed acres of soil Certification that the swppp provides compliance NOI needs to be submitted - - At least 7 days before activity. 3Katelyn Whitman, All Rights Reserved © 2025 The SWPPP must be prepared before - The NOI is filed Under EPAs general permit disturbed areas that will not be redisturbed within ________ days must be stabilized by the _____ day - 14 EPAs GP also requires a sediment basin be installed where more than _____ acres in the upstream drainage area are disturbed at one time. - 10 acres A sediment basin must provide _________ cubic feet of storage for every _______ acre of land that it drains - 3600//1 EPA gives the State _______ days then they take action. - 30 Arrival introduction - -Credentials and ID (who y

Show more Read less
Institution
CESSWI
Module
CESSWI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CESSWI
Module
CESSWI

Document information

Uploaded on
January 23, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Cesswi Exam Questions and Answers
100% Pass


Certified erosion sediment and stormwater inspector - ✔✔CESSWI


Offers no mitigation - ✔✔Ignorance


Controls water pollution by regulating point sources that discharge pollutants into

waters of the US - ✔✔NPDES National pollutant discharge elimination system


MS4 - ✔✔Municipal Separate Storm Sewer System


ESCP - ✔✔Erosion and sediment control plan


Has regulatory authority over the cwa - ✔✔EPA


Return flow from irrigated agriculture or their run off - ✔✔Does not apply to the storm

water term


Only directly to. Or though a separate storm water system into us waters only -

✔✔NPDES REQUIREMENTS


Commercial, retail, light industrial and institutional facilities.


Less than 5 acres



Katelyn Whitman, All Rights Reserved © 2025 1

, MS4 serving fewer than 100k people - ✔✔Phase II


Agriculture is exempt only for - ✔✔Crop production


O&G, forestry, and agriculture discharges are - ✔✔Exempt


Waiver "construction rainfall erosivity waiver" from phase II requirements under 2

conditions - ✔✔Low rainfall potential


Based on TMDL


*only for small sites


Triennial review process - ✔✔States required to review and revise if necessary


Umbrella coverage - ✔✔General Permit


Identifies potential sources of pollution that may effect storm water discharges.


Describes management practices that are to be implemented to reduce pollutants

discharges in stormwater - ✔✔SWPPP


NOI - ✔✔Brief description of project


Estimated timetable for major activities


Estimated disturbed acres of soil


Certification that the swppp provides compliance


NOI needs to be submitted - - ✔✔At least 7 days before activity.


Katelyn Whitman, All Rights Reserved © 2025 2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KatelynWhitman West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1094
Member since
2 year
Number of followers
482
Documents
33057
Last sold
3 days ago
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3.6

238 reviews

5
95
4
38
3
54
2
20
1
31

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions