Acceptance - The written acceptance by the Department of the Work. acceptance testing - Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - The computed cost using calculations provided addendum - A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - The quantity of a completed Item eligible for payment authorized funding amount - The amount of funds authorized by the Department for the Contract Bidder - The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department.

Show more Read less
Institution
Course

Content preview

Nicet level 1 highway construction



Nicet Level 1 Highway Construction
(Question and answers)
Acceptance - ✔✔The written acceptance by the Department of the Work.


acceptance testing - ✔✔Testing conducted by the Department to measure
the degree of compliance to the Contract


actual cost - ✔✔The computed cost using calculations provided


addendum - ✔✔A Contract revision or response to a Contractor inquiry
issued after advertisement and before the opening of bids.


as-built quantity - ✔✔The quantity of a completed Item eligible for payment


authorized funding amount - ✔✔The amount of funds authorized by the
Department for the Contract


Bidder - ✔✔The individual, firm, partnership, corporation, joint venture, or
any acceptable combination thereof that submits a bid to the Department.


bridge - ✔✔. A structure, other than a culvert, including supports, erected
over a depression or an obstruction, such as water, highway, or railway, and
having a track or passageway for carrying traffic or other moving loads and
having a length 3 measured along the center of the structure of more than
20 feet between undercopings of abutments or extreme ends of openings for
multiple boxes. Structure dimensions are defined as follows:


bridge length - ✔✔The overall length measured along the line of survey
stationing from back to back of backwalls of abutments, if present, otherwise
end to end of the bridge floor; but, in no case less than the total clear
opening of the structure



pg. 1

, Nicet level 1 highway construction




bridge width - ✔✔The clear width measured at right angles to the
longitudinal centerline of the bridge between the bottom of curbs, or in the
case of multiple height of curbs, between the bottoms of the lower risers or,
if curbs are not used, between inner faces of parapet or railing


Change Order. - ✔✔A written order issued by the Department to the
Contractor after execution of the Contract authorizing one or more of the
following: 1. Changes in the Work. 2. Modifications in the basis of payment.
3. Modifications to Contract Time.


Commercially Useful Function - ✔✔Occurrences in which the subcontractor is
responsible for the execution of a distinct element of the work of a contract
and carrying out its responsibilities by actually performing, managing, and
supervising the work involved, and with respect to materials and supplies
used on the contract, prepares the estimate, negotiates price, determines
quality and quantity, orders the material, arranges delivery, installs (where
applicable), and pays for the material and supplies itself for the project.


Completion - ✔✔When all of the following have occurred: 1. The Work has
been satisfactorily completed in all respects according to the Contract. 2.
The Project is ready for use by the Department as required by the Contract.
3. The Contractor has satisfactorily executed and delivered to the RE all
documents, certificates, and proofs of compliance required by the Contract
including the Notice of Completion.


construction operations - ✔✔Physical work done in the performance of the
Contract within the Project Limits. Does not include off-site mobilization,
procurement and off-site storage of materials and plants, engineering,
performance bond and payment bond, surveys, working drawings, off-site
field offices, schedules, certificates, forms, or documents


Contract - ✔✔The written integrated agreement between the Department
and the Contractor setting forth the obligations of the parties, including, but
not limited to, the performance of the Work and the basis of payment. It
includes the advertisement, Proposal, Certification as to Publication and
Notice of Advertisement for Proposal, bid, Appointment of Agent by


pg. 2

Written for

Course

Document information

Uploaded on
January 16, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ProfessorJazz

Get to know the seller

Seller avatar
ProfessorJazz Harvard University
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
3 year
Number of followers
0
Documents
92
Last sold
7 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions