CON 367 MIDTERM Exam Questions With Correct Answers 100% Guaranteed Pass. The process of initiating a construction project. - Answer1. Advertise for bids 2. Open bids 3. Award contract 4. Sign the contract 5. Issue notice to proceed Under the Contractor Quality Control (CQC) process, inspection is provided by the contractor - AnswerFalse Owners generally engage the services of a professional construction management firm (Agency CM) in fast-track projects with multiple contracts. - AnswerTrue A professional construction management firm (Agency CM) can participate in the following phases of a project - AnswerConception, program planning, Design, Construction and Closeout The Design-Build (DB) project delivery process may face some barriers when tried to be implemented in the public sector. - AnswerTrue In a project with multiple prime contractors, who is responsible for coordinating the various trade contractors? - AnswerOwner or its representative (e.g. the construction manager) The Resident Project Representative should not direct the contractor's work. - AnswerTrue Which of the following is under the authority of the Resident Project Representative? - AnswerTo approve materials & worksmanship that meet the contract requirements Routing of submittals from the subcontractor to the Designer - Answer1. Subcontractor 2. Contractor 3. Resident Project Repre

Meer zien Lees minder
Instelling
CON 367
Vak
CON 367









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CON 367
Vak
CON 367

Documentinformatie

Geüpload op
16 januari 2025
Aantal pagina's
6
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CON 367 MIDTERM Exam Questions With
Correct Answers 100% Guaranteed Pass.


The process of initiating a construction project. - Answer✔1. Advertise for bids
2. Open bids
3. Award contract
4. Sign the contract
5. Issue notice to proceed
Under the Contractor Quality Control (CQC) process, inspection is provided by the contractor -
Answer✔False
Owners generally engage the services of a professional construction management firm (Agency
CM) in fast-track projects with multiple contracts. - Answer✔True
A professional construction management firm (Agency CM) can participate in the following
phases of a project - Answer✔Conception, program planning, Design, Construction and Closeout
The Design-Build (DB) project delivery process may face some barriers when tried to be
implemented in the public sector. - Answer✔True
In a project with multiple prime contractors, who is responsible for coordinating the various
trade contractors? - Answer✔Owner or its representative (e.g. the construction manager)

The Resident Project Representative should not direct the contractor's work. - Answer✔True
Which of the following is under the authority of the Resident Project Representative? -
Answer✔To approve materials & worksmanship that meet the contract requirements
Routing of submittals from the subcontractor to the Designer - Answer✔1. Subcontractor
2. Contractor
3. Resident Project Representative
4. Project Engineer
5. Design Reviews



1|Page

, The Resident Project Representative should obtain the contract documents and study those as
soon as being engaged to provide resident inspection on a project. - Answer✔True
The Resident Project Representative does not need to make any measurement for the progress
payments in the lump-sum projects - Answer✔False
When the Resident Project Representative identifies a problem with the subcontractor's work,
he/she should provide instructions directly to the subcontractor. - Answer✔False
In a construction project, the general contractor should submit all submittals (e.g., shop
drawings, samples, etc...) directly to: - Answer✔
If the daily Construction Report is generated in the computer, it is advisable that the Resident
Project Representative prints a hard copy, signs it, and files it at the end of each business day. -
Answer✔True
One way of making bid advertisements, as becoming more popular each day, is to post them on
the World Wide Web (internet website). - Answer✔True
The web-based project management systems help reduce turnaround time on communications
and improved access to project paperwork. - Answer✔True
Video cameras/Webcams can be used to document field problem areas in a construction project.
- Answer✔True
One of the items included in the Construction Diary of the Resident Project Representative is the
content of all substantive conversations held with the contractor at the site. - Answer✔True
The basic rule of contracts is that in case of ambiguity in the contract language, the intent of the
contract will generally be construed against the party who drafted the contract. - Answer✔True
What is the order of the sections in the three-part section format of the CSI specifications? -
Answer✔1. General
2. Products
3. Execution
The specifications should contain absolute dimensions and avoid tolerances in those dimensions.
- Answer✔False
Match the following terms as used in the contract documents produced in the US with the ones
as used in the contract documents produced by the International Federation of Consulting
Engineers (FIDIC). - Answer✔Bid = Tender


Guarantee Period = Defects Liability Period


Bid Schedule = Bill of Quantities

2|Page

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TheStar Florida State University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
595
Lid sinds
1 jaar
Aantal volgers
178
Documenten
23585
Laatst verkocht
9 uur geleden
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

119 beoordelingen

5
56
4
21
3
21
2
4
1
17

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen