Con 367 Midterm 2 (Prep Quiz) Exam Questions With Correct Answers 100% Guaranteed Pass. True/ False The dollar amount shown for each line item in a Schedule of Values reflects the direct cost for that line item only and does not include the profit and overhead. - AnswerFalse Which of the following is not in the To-Do list for the Facilitator in a Meeting? -Empower the attendees to communicate their ideas only if they agree with you. -Have an agenda and distribute it to the attendees well in advance of the meeting. - Know what you want to accomplish. -Communicate action items at the conclusion of the meeting. - AnswerEmpower the attendees to communicate their ideas only if they agree with you. Which of the following is not the responsibility of the Designer? -Generate the shop drawings in a timely manner. -Review the RFIs and respond to them in a timely manner. -Consult with the Resident Project Representative in evaluating the RFIs. 2 | P a g e -Avoid directing or controlling the Contractor's means and methods. - AnswerGenerate the shop drawings in a timely manner. True/ False Preconstruction meeting is typically held after the construction operations begin. - AnswerFalse True/ False Builder's Risk Insurance is typically purchased by the Designer. - AnswerFalse Which of the following is not a characteristic of Schedule of Values (SOV)? -It should be prepared by the Contractor and submitted to the Owner at the end of the project. -Line items in the SOV are typically determined by the Owner. -The greater the detail in the SOV, the more accurate the estimate for the progress payments. -The Contractor must prorate overhead and profit on the line items in the SOV. - AnswerIt should be prepared by the Contractor and submitted to the Owner at the end of the project. In the tripartite relationship inherent in construction bonding between the Owner, Contractor, and Surety, which one is the Obligee? - AnswerOwner True/ False According to the negotiation method discussed in class (Getting to Yes), one thing that needs to be done during negotiations is not to attack each other but to attack the problem. - AnswerTrue Which of the following statements is wrong for Retainage? -Retainage is typically 25-30% of each earned fund. -In some cases, the retained amount may be reduced or eliminated at some point during the project (typically after the half of the project is completed). -Sometimes the Owner may release retainage early on work that was completed early in the project, typically for subcontractors (e.

Meer zien Lees minder
Instelling
CON 367
Vak
CON 367









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CON 367
Vak
CON 367

Documentinformatie

Geüpload op
16 januari 2025
Aantal pagina's
7
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Con 367 Midterm 2 (Prep Quiz) Exam
Questions With Correct Answers 100%
Guaranteed Pass.


True/ False
The dollar amount shown for each line item in a Schedule of Values reflects the direct cost for
that line item only and does not include the profit and overhead. - Answer✔False
Which of the following is not in the To-Do list for the Facilitator in a Meeting?


-Empower the attendees to communicate their ideas only if they agree with you.


-Have an agenda and distribute it to the attendees well in advance of the meeting.


- Know what you want to accomplish.


-Communicate action items at the conclusion of the meeting. - Answer✔Empower the attendees
to communicate their ideas only if they agree with you.
Which of the following is not the responsibility of the Designer?


-Generate the shop drawings in a timely manner.


-Review the RFIs and respond to them in a timely manner.


-Consult with the Resident Project Representative in evaluating the RFIs.




1|Page

, -Avoid directing or controlling the Contractor's means and methods. - Answer✔Generate the
shop drawings in a timely manner.
True/ False
Preconstruction meeting is typically held after the construction operations begin. -
Answer✔False
True/ False
Builder's Risk Insurance is typically purchased by the Designer. - Answer✔False
Which of the following is not a characteristic of Schedule of Values (SOV)?


-It should be prepared by the Contractor and submitted to the Owner at the end of the project.


-Line items in the SOV are typically determined by the Owner.


-The greater the detail in the SOV, the more accurate the estimate for the progress payments.


-The Contractor must prorate overhead and profit on the line items in the SOV. - Answer✔It
should be prepared by the Contractor and submitted to the Owner at the end of the project.
In the tripartite relationship inherent in construction bonding between the Owner, Contractor, and
Surety, which one is the Obligee? - Answer✔Owner
True/ False
According to the negotiation method discussed in class (Getting to Yes), one thing that needs to
be done during negotiations is not to attack each other but to attack the problem. - Answer✔True
Which of the following statements is wrong for Retainage?


-Retainage is typically 25-30% of each earned fund.


-In some cases, the retained amount may be reduced or eliminated at some point during the
project (typically after the half of the project is completed).


-Sometimes the Owner may release retainage early on work that was completed early in the
project, typically for subcontractors (e.g. site work).


2|Page

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TheStar Florida State University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
595
Lid sinds
1 jaar
Aantal volgers
178
Documenten
23585
Laatst verkocht
10 uur geleden
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

119 beoordelingen

5
56
4
21
3
21
2
4
1
17

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen