Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Permit Technician 2025 Study Sessions Questions With Complete Solutions

Rating
-
Sold
-
Pages
44
Grade
A+
Uploaded on
13-01-2025
Written in
2024/2025

Permit Technician 2025 Study Sessions Questions With Complete Solutions

Institution
Icc Permit Technician
Course
Icc permit technician

Content preview

Permit Technician 2025 Study Sessions Questions With
Complete Solutions

____ powers arise from those powers expressly granted but that
may not be specifically authorized Correct Answers Implied

________ takes place when a community puts into place a plan
to revitalize depressed areas in that community Correct
Answers Urban renewal

"HVAC" stands for Correct Answers heating, ventilation and
air conditioning

A __________ must frequently be published in the local
newspaper when a building code is being proposed for adoptio
Correct Answers notice of intent

A boarding house is defined as a dwelling containing a single
dwelling unit and not more than ___________sleeping units.
Correct Answers 10

A building code Correct Answers is a legal document that
regulates the construction of buildings and structures

A building code is adopted by a jurisdiction as Correct Answers
Law

A building permit is Correct Answers a license to build

,A building permit may be revoked for all of the following
reasons except Correct Answers disagreeing with the code
official's interpretation

A building that contains large quantities of highly explosive
materials would be classified as a Group _________ occupancy
Correct Answers H-1

A building used for assembly purposes with an occupant load of
less than 50 persons shall be considered a Group __________
occupancy Correct Answers B

A conditional-use permit shall expire when such permit is
abandoned or discontinued for a period of Correct Answers 1
year

A congregate living facility with primarily permanent residents
and an occupant load of 12 persons would be classified as a
Group __________ occupancy Correct Answers R-3

A convenience market with a motor vehicle fuel-dispensing
facility is classified as a Group __________ occupancy. Correct
Answers M

A correction notice informs the contractor of Correct Answers
what must be done to bring inspected work into compliance with
the code

A county form of government is usually considered a(n) Correct
Answers arm of the state

,A cross-sectional view through the short axis of a building is
also known as a Correct Answers transverse section

A day-care facility where supervision or personal care services
are provided to 14 children, all above the age of 21/2 years, shall
be classified as a Group __________ occupancy Correct
Answers E

A determination by the building official to allow construction
below the level prescribed by the flood hazard provisions
requires written notice to the applicant stating that Correct
Answers construction below the design flood elevation
increases risks to life and property

A doctrine that provides that a plaintiff who alleges inadequate
performance of a governmental activity has the burden to show
that the municipality owed a specific duty to the plaintiff and not
simply to the general public is known as the
___________doctrine. Correct Answers public duty

A drawing showing a particular building element on a larger
scale is known as a Correct Answers detail

A hearsay statement is permissible in court when it is Correct
Answers an admission of a party involved

A judicial order that is issued after the court has heard all of the
evidence in the case is known as a Correct Answers permanent
injunction

A local law is known as a(n) Correct Answers ordinance

, A lumberyard is considered a Group __________ occupancy
Correct Answers S-1

A minimum of ___________inches in clear headroom in the
attic space shall be provided at or above the access opening.
Correct Answers 30

A model code cannot be adopted without Correct Answers
referencing the specific edition

A parcel of land bounded by a lot line or a designated portion of
a public right-of-way is known as a Correct Answers site

A performance type code Correct Answers allows design
professionals to select alternative methods and materials,
provided the final outcome meets the minimum requirements for
health, safety and welfare

A permit is not required for Correct Answers connection of
approved portable electrical equipment

A power which has been "set forth and declared exactly" is
known as __________ power Correct Answers expressed

A prescriptive code Correct Answers describes exactly what
methods and materials are to be used during construction

A public park is permitted in a(n) ___________ zoning district
Correct Answers R-1

Written for

Institution
Icc permit technician
Course
Icc permit technician

Document information

Uploaded on
January 13, 2025
Number of pages
44
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Demetrius NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
View profile
Follow You need to be logged in order to follow users or courses
Sold
259
Member since
3 year
Number of followers
159
Documents
4570
Last sold
3 months ago

4.4

88 reviews

5
62
4
14
3
5
2
1
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions