100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU C722: Project Management Methods and Practices – Module 15

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
05-01-2025
Written in
2024/2025

WGU C722: Project Management Methods and Practices – Module 15

Institution
WGU C722
Course
WGU C722









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU C722
Course
WGU C722

Document information

Uploaded on
January 5, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

WGU C722: Project Management Methods and Practices –
Module 15

PERT (Project Evaluation & Review Technique) - correct answer ✔✔(PERT) was developed in the 1950s to
support the U.S. Navy's Polaris missile project. PERT is used to estimate activity duration times. It uses a
statistical approach to estimate the time that will be required to complete project work activities. PERT
techniques are recommended by PMBOK when estimating activity duration times that vary.



CPM (Critical Path Method) - correct answer ✔✔Developed for the Dupont Corporation to estimate
activity time durations, this method assumes time can be reliably estimated.



CCPM (Critical Chain Project Management) - correct answer ✔✔CCPM applies the theory of constraints
logic to project management by recognizing that the project can only be completed if the resource
(person, machine, capital, etc.) capacity is available. In CCPM, the work each resource is expected to
complete is checked to verify that the resource will be capable and available when needed. Time buffers
are built into the schedule to handle situations when the critical resources fall behind or aren't available.
Focuses on managing the uncertainties of a project and builds buffers into the schedule to prevent key
activities from failing.



Waterfall Method - correct answer ✔✔The Waterfall method is a traditional practice which found its
best use in software and hardware development. In this method, the project work flows downward like
water falling over a ledge. The initial programs are designed by software developers and then handed
over to programmers to create the computer code. The programmers then hand the completed code to
the quality control analysts who then test the code and turn it over to the customer for acceptance
testing. This process flows logically and in a linear fashion, but if any problems are found, returning the
work back to the previous step is very expensive - much like the difficulty of swimming back up a
waterfall. This method organizes project tasks into linear workflows.



PRINCE2 - correct answer ✔✔Projects in controlled environments (PRINCE2Ⓣ) is a highly structured
project management method which focuses on the specification of the outputs rather than the
coordination of activities (PMBOK). PRINCE2 includes very specific processes and terminology to ensure
that all project participants understand the work. PRINCE2 has received wide acceptance in the
European Union and other regions of the world. Focuses on the specification of outputs, including very
specific processes and terminology.

, Complexity in PM - correct answer ✔✔The Merriam-Webster Dictionary defines "complex" as "a whole
made up of complicated or interrelated parts." That definition is well-suited for project management
where many parts contribute to the project outcomes and the outcome itself may be many complicated
and/or interrelated parts. The level of comlexity needs to be considered when selecting an appropriate
project management method.



Uncertainty in PM - correct answer ✔✔The Merriam-Webster Dictionary defines uncertain as "not
exactly known or defined." This uncertainty can come into project management with regard to the
desired outcome or the technologies and processes that will be used to generate the outcome. It may
initially seem hard to conceive, but in reality the customer is often unable to fully define the desired
project outcome in advance. EXAMPLE Have you ever gone to the store with the intent to purchase
something but when you got there, there were options that you had not considered? Such is the case in
project management. The customer may provide a specific project scope at project initiation, but only
during project execution do they realize the full range of functionality that they should have requested.



Project Processes (5 steps) - correct answer ✔✔The project life cycle, introduced earlier in this course,
provided a high-level view of the work that needs to be done in order to complete a project. The five
steps are logical groups of processes which outline what must occur in order to manage the project.
Initiating, Planning, Excecuting, Monitoring and Controlling, Closing.



Intiating - correct answer ✔✔The processes completed during the Initiating include:

*Documenting the business need for the project and what problem the project will solve. * Defining the
project * Evaluating the project proposals * Completing the project selection * Identifying major
stakeholders * Creating the project charter

The processes involved with initiating define the project and determine which projects the organization
will undertake. These activities often occur prior to the selection of the project team or the project
manager.The project evaluation methods discussed earlier are completed as part of the initiating
process. These preliminary steps are important since they will set the trajectory for the project. If the
project is not clearly defined and developed to satisfy a specific business need then the project may not
reach a successful conclusion. When the initiating processes are completed, if the project is approved to
move forward, the project charter is issued and signed by the project sponsor.



Planning - correct answer ✔✔The process completed during the planning include:

* Documenting all customer requirements and deliverables

* Estimating resources needed * Finalizing the project scope * Finalizing the project budget * Finalizing
the project schedule * Creating the Work Breakdown Structure * Creating the network diagram *
Creating the activity list * Writing the plan for specific areas (quality, communications, human resources,

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BravelRadon Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
868
Member since
4 year
Number of followers
540
Documents
41080
Last sold
10 hours ago
EXAM HUB

Welcome to Exam Hub Are you looking for high-quality, exam-ready notes, past papers, Test Banks, and well-researched study materials to boost your grades? You’re in the right place! I create and upload detailed, easy-to-understand, and well-structured documents across multiple subjects. All my materials are designed to help you study , save time, and excel in your coursework and exams! On this page NURSING EXAMS,STUDY GUIDES,TESTBANKS AND QUALITY EXAMS IS THE KEY TO STUDENTS CAREER EXCELLENCE, you find all documents, package deals, and flashcards offered by BravelRadon (EXAM HUB STORES!)....kindly recommend a friend for A+ GARANTEEd either you are a first-year student or final-year graduation! best of luck!

Read more Read less
3.5

153 reviews

5
55
4
30
3
32
2
8
1
28

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions