BASE
EXAM DUMPS
DELL EMC
D-PSC-MN-01
28% OFF Automatically For You
Dell PowerScale Maintenance
,1.A customer notices a platform engineer intentionally leaving a 1U gap underneath a
Dell PowerScale H400 chassis during racking and stacking What is the purpose of the
gap?
A. Backend Ethernet switch
B. Cable management tray
C. Location to install archive nodes
D. Required blanking panel for node separation
Answer: B
Explanation:
During the installation of Dell PowerScale H400 nodes, it is standard practice to leave
a 1U gap underneath the chassis to accommodate the Cable Management Tray
(CMT). The Cable Management Tray is essential for organizing and supporting the
network and power cables connected to the node. Proper cable management ensures
yl
th
that cables are neatly routed, reduces stress on the connectors, and prevents
oo
m
obstruction of airflow within the rack.
S
m
According to the Dell PowerScale Hardware Installation and Planning Guide, the
xa
E
inclusion of a Cable Management Tray improves serviceability and maintains optimal
r
ou
Y
airflow by preventing cables from hanging in front of the equipment or blocking
s
as
ventilation paths. By intentionally leaving a 1U gap, the platform engineer ensures
-P
)
that the Cable Management Tray can be installed without interfering with the node's
02
9.
(V
operation or the rack's structural integrity.
ps
Reference: Dell PowerScale Hardware Installation and Planning Guide
um
D
Best Practices for Cable Management in Dell PowerScale Systems
m
xa
E
1
-0
N
-M
2.Which cluster interface provides the most detailed network traffic statistics and
C
S
-P
enables file and directory operations on the cluster?
D
C
A. Web console
M
E
B. Serial console
LL
E
D
C. Platform API
h
it
D. CLI
w
e
ar
Answer: D
p
re
Explanation:
P
The Command Line Interface (CLI) provides the most comprehensive and detailed
interaction with a Dell PowerScale cluster. Through the CLI, administrators have
access to a wide range of commands that offer detailed network traffic statistics,
system performance metrics, and the ability to perform granular file and directory
operations.
While the Web console offers a user-friendly graphical interface for cluster
management, it may not provide the same level of detail or the full set of
functionalities available in the CLI. The Serial console is primarily used for initial setup
or troubleshooting when network access is unavailable. The Platform API allows for
programmatic access but requires additional development effort to utilize. The CLI is
, accessible via SSH and provides tools like isi statistics for detailed performance
metrics and isi commands for file system operations. This makes it the most powerful
interface for administrators needing in-depth information and control over the cluster.
Reference: Dell PowerScale OneFS Command-Line Administration Guide Dell
PowerScale OneFS CLI Reference Guide
3.A platform engineer is connecting a new Dell PowerScale F600 node to the frontend
switch in an existing cluster with legacy nodes.
How should the network cables be connected?
A. From the PCIe slot 1 to the frontend Ethernet switch
B. From the PCIe slot 3 to the frontend Ethernet switch
C. From the PCIe slot 1 to the frontend InfiniBand switch
yl
th
D. From the PCIe slot 3 to the frontend InfiniBand switch
oo
m
Answer: A
S
m
Explanation:
xa
E
When connecting a Dell PowerScale F600 node to the frontend network in an existing
r
ou
Y
cluster with legacy nodes, it's important to follow the correct cabling practices to
s
as
ensure network compatibility and optimal performance.
-P
)
The F600 node uses PCIe slot 1 for frontend (client) network connections. This slot
02
9.
(V
supports Ethernet network interfaces that handle client traffic. PCIe slot 3 is typically
ps
reserved for backend (cluster interconnect) networking. Since the cluster includes
um
D
legacy nodes, and assuming they use Ethernet for frontend connectivity, the F600
m
xa
should connect its frontend network interfaces from PCIe slot 1 to the frontend
E
1
Ethernet switch.
-0
N
-M
Connecting the cables from PCIe slot 1 to the frontend Ethernet switch ensures that
C
S
-P
the F600 node properly communicates with clients and integrates seamlessly into the
D
C
existing cluster network infrastructure.
M
E
Reference: Dell PowerScale F600 Technical Specifications Guide
LL
E
D
Dell PowerScale Network Configuration Guide
h
it
Best Practices for Adding Nodes to an Existing Dell PowerScale Cluster
w
e
ar
p
re
P
4.A platform engineer connected to a Dell PowerScale F600 node using a serial
connection. The session is unresponsive.
What action must the engineer take?
A. Restart the server using the front panel power button.
B. Check the settings of the serial connection.
C. Replace the serial cable with a new one.
D. Update the node firmware to the latest release
Answer: B
Explanation:
When a platform engineer connects to a Dell PowerScale F600 node using a serial