APP wash/dry - ANS-WSH +RS /DRY+RS
CLN FCC - ANS-Clean ground overlaying carpet and deodorize.
CON LAB - ANS-Content manipulation charge per hour
CON PROT - ANS-+Protect contents/cowl with plastic.
DMO definition and alternatives. - ANS-PU-choose up truckload. DUMP-dumpster with -for
smaller load.
DRY 5/8 - ANS-Hung, taped, ready for texture +quantity of rectangular feet.
DRY LF - ANS-Drywall in step with LF up to 2ft tall
DRY LF> - ANS-Up to 4ft
DRY TEX - ANS-Texture drywall mild hand texture +square feet.
FCC LAY - ANS-Floor coveing carpet/lay exisiting carpet. Always F
FCC PAD - ANS-Carpet PAD rectangular pictures of carpet in room.
PNT B2 - ANS-Paint baseboard + coats PF or LF
PNT MASKLF - ANS-Mask and prep for paint. Plastic, paper, tape Per LF. Always PC ceiling.
PNT P2 - ANS-Paint parts of the partitions two coats. .25w/.50w/WC/C