100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

VA DEQ SWM Inspector Exam Questions and Correct Answers Latest Update 2024

Rating
3.5
(2)
Sold
4
Pages
5
Grade
A+
Uploaded on
11-12-2024
Written in
2024/2025

VA DEQ SWM Inspector Exam Questions and Correct Answers Latest Update 2024 What element is targeted by water quality criteria? - Answers Phosphorous, it indicates pollution by bonding with other pollutants. At what % impervious cover are streams substantially affected? - Answers 25% what is the site-based load limit for water quality? - Answers 0.41 lbs/acre/yr total phosphorous Virginia Runoff Reduction Method- method of load calculations - Answers load calculations based on land cover type and soil type. what must happen to potentially harmful sheet flow runoff? - Answers Must be diverted to stormwater conveyance system. SWM ponds must be able to convey water safely up to what level storm event? - Answers must be able to safely convey up to a 100 yr storm. Define LDA - Answers Land disturbing activity; any man-made change to the land surface that potentially changes its runoff characteristics; includes clearing, grading, and excavation. What size LDA must comply with stormwater management regulation? in CPBA areas? - Answers anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more stringent locally. what are some activities exempt from SWM regulations? - Answers mining, agriculture, sewer discharges, local reclamation programs, routine maintenance of preexisting operations, public emergency activity what term basically means a plea deal for stormwater offenders? - Answers consent order, which replaces penalties with fines. how long does VSMP authority have to review SWM plan? - Answers 15 days to review and determine approval, and notify applicant. How often must a VSMP authority inspect an LDA? - Answers Periodically. all SWPPP requirements may be met by - Answers incorporating other plans into reference, or by developing missing elements. What must the DEQ issue to an operator before an LDA? - Answers a construction GP How soon after final grade of a site must vegetation be put in place? - Answers within 7 days. How long must operator keep routine inspection reports? - Answers At least 3 years after the GP expires/terminates. How long does operator have to revise SWPPP if authority deems it necessary? How long does local authority have to review any modifications to SWPPP? - Answers 7 days for operator to make changes, 60 days for authority to review changes. How long does operator have to notify DEQ of an unauthorized discharge? How long does operator have to make a written report of this? - Answers within 24 hours of discovery for notification, within 5 days for written acknowledgement. What constitutes a measurable rain event according to GP? - Answers 0.25 in. or more over 24 hours. Co-located practices - Answers During construction, a facility functions for ESC, and is later constructed into a stormwater BMP. During construction, when should inspector make sure a BMP is not installed? - Answers BMP should not be installed before contirbuting drainage area has been stabilized. Notice of Termination forms, to terminate construction permits, must be sent after how many days once conditions are met? - Answers 30 days When is ground considered stabilized? - Answers when vegetation is uniform, mature enough to survive, and will inhibit erosion. How long must VSMP authority keep construction record drawings? - Answers Until the relevant SWM facility is removed. How soon after meeting permit requirements must the VSMP authority return any bonds or securities to operator? - Answers within 60 days. VSMP authorities must ensure that SWM facilities, post-construction, are inspected at least once every ___ years, unless: - Answers at least once every 5 years unless a certified personnel provides inspection reports at least once a year. What legislation authorizes the VA SWM Program? - Answers The Virginia Stormwater Management Act What regulation administers the VA SWM Program? - Answers The Virginia Stormwater Management Program Regulation The Stormwater Management act requires the State Water Control Board to do what? - Answers permit, regulate, and control stormwater runoff How many days does DEQ have to complete review of real or potential inter-jurisdicitonal impacts upon request? - Answers 90 days Who is required to maintain a certificate of competency by the Stormwater Management Act? - Answers staff of a stormwater program, anyone contracted by a VSMP authority, and all standard and specification holders A SWM Plan must be approved by who prior to land disturbance? - Answers the VSMP Program Authority What is the TP limit for a site? - Answers 0.41 lbs/ac/yr The phosphorus load limit uses what % impervious cover? - Answers 10% Part II B and II C water quantity criteria addresses: - Answers channel protection and flood protection Of all the plans included in the SWPPP, which two must be approved? - Answers the SWM and ESC Plans Does a SWM plan address runoff during or after construction? - Answers post-construction What is the lower limit of imperviousness which could result in stream degradation? - Answers 10% If land disturbance occurs as a result of emergency work, what is the timeline for advising the VSMP authority of the disturbance? - Answers within 7 days of commencing the LDA and a permit application must be submitted within 30 days DEQ is responsible for enforcing the ______ while locality _______ are responsible for enforcing local ordinances. - Answers Construction GP, VSMP BMPs use these three mechanisms to control pollution: - Answers Infiltration, settling, and vegetative uptake How long does a locality VSMP authority have to determine the completeness of a SWM plan? - Answers 15 days Every year, the locality VSMP must submit information to DEQ. When is this due, and what info must be provided? - Answers Due by Oct. 1, and must include: new types of SWM facilities, geographic coordinates of them, acres treated, and surface waters/karst features into which they discharge. A locality VSMP must be at least as stringent as what state permit? - Answers The construction GP What is the maximum penalty that may be imposed under the stormwater management act? - Answers $32,500 How long must a VSMP authority retain a registration statement? - Answers At least three years after project completion or state permit termination.

Show more Read less
Institution
VA DEQ SWM Inspector
Course
VA DEQ SWM Inspector









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VA DEQ SWM Inspector
Course
VA DEQ SWM Inspector

Document information

Uploaded on
December 11, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

VA DEQ SWM Inspector Exam Questions and Correct Answers Latest Update 2024



What element is targeted by water quality criteria? - Answers Phosphorous, it indicates pollution by
bonding with other pollutants.

At what % impervious cover are streams substantially affected? - Answers 25%

what is the site-based load limit for water quality? - Answers 0.41 lbs/acre/yr total phosphorous

Virginia Runoff Reduction Method- method of load calculations - Answers load calculations based on
land cover type and soil type.

what must happen to potentially harmful sheet flow runoff? - Answers Must be diverted to stormwater
conveyance system.

SWM ponds must be able to convey water safely up to what level storm event? - Answers must be able
to safely convey up to a 100 yr storm.

Define LDA - Answers Land disturbing activity; any man-made change to the land surface that potentially
changes its runoff characteristics; includes clearing, grading, and excavation.

What size LDA must comply with stormwater management regulation? in CPBA areas? - Answers
anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more stringent locally.

what are some activities exempt from SWM regulations? - Answers mining, agriculture, sewer
discharges, local reclamation programs, routine maintenance of preexisting operations, public
emergency activity

what term basically means a plea deal for stormwater offenders? - Answers consent order, which
replaces penalties with fines.

how long does VSMP authority have to review SWM plan? - Answers 15 days to review and determine
approval, and notify applicant.

How often must a VSMP authority inspect an LDA? - Answers Periodically.

all SWPPP requirements may be met by - Answers incorporating other plans into reference, or by
developing missing elements.

What must the DEQ issue to an operator before an LDA? - Answers a construction GP

How soon after final grade of a site must vegetation be put in place? - Answers within 7 days.

How long must operator keep routine inspection reports? - Answers At least 3 years after the GP
expires/terminates.

, How long does operator have to revise SWPPP if authority deems it necessary? How long does local
authority have to review any modifications to SWPPP? - Answers 7 days for operator to make changes,
60 days for authority to review changes.

How long does operator have to notify DEQ of an unauthorized discharge? How long does operator have
to make a written report of this? - Answers within 24 hours of discovery for notification, within 5 days
for written acknowledgement.

What constitutes a measurable rain event according to GP? - Answers 0.25 in. or more over 24 hours.

Co-located practices - Answers During construction, a facility functions for ESC, and is later constructed
into a stormwater BMP.

During construction, when should inspector make sure a BMP is not installed? - Answers BMP should
not be installed before contirbuting drainage area has been stabilized.

Notice of Termination forms, to terminate construction permits, must be sent after how many days once
conditions are met? - Answers 30 days

When is ground considered stabilized? - Answers when vegetation is uniform, mature enough to survive,
and will inhibit erosion.

How long must VSMP authority keep construction record drawings? - Answers Until the relevant SWM
facility is removed.

How soon after meeting permit requirements must the VSMP authority return any bonds or securities to
operator? - Answers within 60 days.

VSMP authorities must ensure that SWM facilities, post-construction, are inspected at least once every
___ years, unless: - Answers at least once every 5 years unless a certified personnel provides inspection
reports at least once a year.

What legislation authorizes the VA SWM Program? - Answers The Virginia Stormwater Management Act

What regulation administers the VA SWM Program? - Answers The Virginia Stormwater Management
Program Regulation

The Stormwater Management act requires the State Water Control Board to do what? - Answers permit,
regulate, and control stormwater runoff

How many days does DEQ have to complete review of real or potential inter-jurisdicitonal impacts upon
request? - Answers 90 days

Who is required to maintain a certificate of competency by the Stormwater Management Act? - Answers
staff of a stormwater program, anyone contracted by a VSMP authority, and all standard and
specification holders

Reviews from verified buyers

Showing all 2 reviews
8 months ago

8 months ago

Thanks for recognizing my documents useful in your revision. I won't tire providing Quality materials that meets your needs .

9 months ago

9 months ago

Thank you for your reviews.

3.5

2 reviews

5
0
4
1
3
1
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
343
Member since
1 year
Number of followers
16
Documents
28801
Last sold
3 days ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

53 reviews

5
18
4
14
3
12
2
0
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions