What is the purpose of the Virginia Stormwater Management Program (VSMP)?
✔✔To regulate and manage stormwater runoff from new and redevelopment projects to protect
water quality.
What is the minimum requirement for erosion and sediment control on construction sites under
Virginia law?
✔✔The site must have an approved Erosion and Sediment Control Plan (ESCP) prior to any land
disturbance activities.
What must an inspector verify during a stormwater management inspection?
✔✔That the site is in compliance with the approved stormwater management plan, and that
BMPs are functioning properly.
What is the purpose of a Stormwater Pollution Prevention Plan (SWPPP)?
✔✔To identify sources of pollution at a construction site and outline measures to prevent the
contamination of stormwater runoff.
1
,What is considered a Best Management Practice (BMP) for controlling stormwater runoff on a
construction site?
✔✔Installing silt fences and sediment basins to prevent sediment from being carried into nearby
water bodies.
When is a project required to apply for a General Permit for Stormwater Discharges in Virginia?
✔✔When land-disturbing activities will disturb one acre or more of land.
What is the function of a sediment basin on a construction site?
✔✔To temporarily store stormwater runoff and allow sediment to settle before the water is
discharged.
What is the most effective way to reduce the amount of sediment leaving a construction site?
✔✔By using sediment control practices such as silt fences, hay bales, and sediment basins.
What is the primary role of the Virginia Department of Environmental Quality (DEQ) regarding
stormwater management?
✔✔To oversee and enforce compliance with stormwater regulations and provide guidance on
best management practices.
2
, What is required for the final stabilization of a construction site before the permit is closed?
✔✔The site must have permanent vegetation, or an equivalent stabilization measure, to prevent
erosion.
What is an example of a structural BMP for stormwater management?
✔✔A retention pond that captures and stores stormwater runoff to prevent flooding and water
quality degradation.
What is the significance of the Virginia Erosion and Sediment Control Law?
✔✔It ensures that land-disturbing activities are properly controlled to minimize soil erosion and
protect water quality.
What is the minimum requirement for maintaining a stormwater management system on a
construction site?
✔✔The system must be inspected regularly, and any necessary maintenance must be performed
to ensure its effectiveness.
When should a Notice of Termination (NOT) be submitted for a construction project?
3