Answers
Defense readiness reporting systems (DRRS) measures readiness to provide needed capabilities
for missions as expressed by the organizations Correct Ans-mission essential task (MTK)
the status of resource and training system (SORTS) is designed to Correct Ans-provided a
broad assessment of unit status based on units ability to execute missions
who designs and develops status of resources and trainin system (SORTS) measurement criteria
to provide valid assessments regarding unit readiness Correct Ans-functional area managers
(FAM)
who reports on the inventory and status of aircraft in status resources and training system
(SORTS) Correct Ans-maintenance units
where are all AF designed operational capability (DOC) statements centrally located Correct
Ans-Defense readiness reporting system (DRRS)
how frequently must the MAJCOM, field operating agency or direct reporting unit command
reporting organizations, and the measured commander review designed operational capability
(DOC) statements Correct Ans-annually
, changes to the unit designed operational capability (DOC) statements must be completed within
how many days Correct Ans-60
on which network or portal does the air and space expeditionary reporting tool (ART) reside
Correct Ans-SIPRNET
on which network or portal does the (ART) training site reside Correct Ans-NIPRNET
air and space expeditionary (ART) complements readiness data reported in Correct Ans-status
of resources and training system (SORTS)
who is responsible for associating, tracking, and managing personnel and equipment in unit type
codes (UTC) and assigning them to the proper AFE Correct Ans-unit commanders
how frequent all AF and AF gained units must submit and update unit type code assessments
every Correct Ans-30 days
who is responsible for matching postured (UTC) requirements to unit manpower document
(UMD) authorizations Correct Ans-functional area managers (FAM)
what is the responsibility of a pilot unit when preparing for deployments Correct Ans-
developing and maintaining standard manpower and logistics details