100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Introduction To Materials Management Exam Questions Answered Correctly Latest Update 2024 (Already Passed)

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
05-12-2024
Written in
2024/2025

Introduction To Materials Management Exam Questions Answered Correctly Latest Update 2024 (Already Passed) Channel master - Answers Individual or company that takes the initiative to integrate both the upstream and downstream supply chain, getting members to work cooperatively to lower total costs and achieve greater efficiency. Configure to Order (CTO) - Answers - customer is allowed to configure a product based on various features and options. - delivery lead time is reduced because there is no design time required and the different features and options may already be available. Engineer to Order (ETO) - Answers - unique engineered design or significant customizations. - customer is highly involved, inventory will not normally be purchased until needed by manufacturing, delivery time is long because it includes not only purchase lead time but also design lead time. Assemble to Order (ATO) - Answers - product is made from standard components or options that the manufactuer can inventory and assemble. - delivery lead time is reduced further because there is no design time needed and inventory is held already for assembly. Make to Order (MTO) - Answers - manufacturing does not start making the product until an order is received. the final product is usually made from standard items but may include custom-designed components as well. - delivery lead time is reduced because there is little design time required and inventory is held in raw material Make to Stock (MTS) - Answers - supplier manufactures the goods and sells from a finished goods inventory. - delivery lead time is shortest as manufacturing and assembly have already been completed. customer has little direct involvement in the product design Reverse Logistics - Answers The area of logistics that involves bringing goods back to the manufacturer because of defects or for recycling materials. Advanced Planning and Scheduling (APS) - Answers approach has often included the suppliers and customers in the planning, thereby attempting to optimize the performance of the entire supply chain. Capacity - Answers the quantity of work that labour and equipment can preform in a given period. Production Activity Control (PAC) - Answers implementation and control phase of the production planning and control system. responsible for planning and controlling the flow of work through the factory. the planning horizon is very short, perhaps from a day to a month. level of detail is high since it is concerned with individual components, workstations, and orders. plans are reviewed and revised daily Resource Bill - Answers shows the quantity of critical resources (materials, labor, and bottleneck operations) needed to make one average unit of the product group Sales and Operations Planning (S&OP) - Answers a process for continually revising the strategic business plan and coordinating plans of the various departments. - places it in a better position to plan changes. - better management of production, inventory, and backlog -manages change rather than reacting to changes in market conditions or the economy after they happen Define capacity and priority. Why are they important in production planning? - Answers finding compromise where production runs as long as possible but priority (demand) is satisfied. Describe each of the following plans in terms of their purpose, planning horizon, level of detail, and planning cycle: a. strategic plan b. business plan c. production plan d. master production schedule e. materials requirement plan f. production activity control - Answers a. statement of the major goals and objectives the company expects to achieve over the next 2-10 years. the plan gives general direction about how the company hopes to achieve these objectives. responsibility of the senior management b. each department produces its own plans to achieve the objectives set by the strategic business plan. usually reviewed every 6 months to a year. level of detail is not high. c. quantities of each product group that must be produced in each period, desired inventory levels, resources of equipment, labour, and materials needed in each period, the availability of the resources needed. the level of detail is not high also known as aggregate production plan. what are 4 questions a good planning system must answer? - Answers 1. what are we going to make or provide to customers? 2. what does it take to make it? 3. what do we have? 4. what do we need? What is MRP II? - Answers effective planning of all resources of a manufacturing company. focusing solely on manufacturing What is ERP? - Answers framework for organizing, defining, and standardizing the business process necessary to effectively plan and control an organization so the organization can use its internal knowledge to seek external advantage. on what basis should product groups (families) be established? - Answers based on the similarity of manufacturing processes and resources used what are 5 typical characteristics of the production planning problem? - Answers 1. a time horizon of 12 months or more is used, with periodic updating perhaps every month or quarter 2. production demand consists of one or a few product families or common units 3. demand is fluctuating or seasonal 4. plan and equipment are fixed within the time horizon 5. a variety of management objectives are set, such as low inventories, efficient plant operation, good customer service, and good labor relations. describe 4 conditions under which a firm would make-to-stock - Answers make to stock environment products are made and put into inventory before an order is received from a customer. sale and deliver of goods are made from inventory. demand should be fairly constant and predictable, few product options, delivery times demanded by the market place are much shorter than the time needed to make the product. what information is needed to develop a make-to-stock production plan? - Answers - forecast by period for the planning horizon - opening inventory - desired ending inventory

Show more Read less
Institution
Introduction To Materials Management
Course
Introduction To Materials Management









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Introduction To Materials Management
Course
Introduction To Materials Management

Document information

Uploaded on
December 5, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Introduction To Materials Management Exam Questions Answered Correctly Latest Update 2024
(Already Passed)

Channel master - Answers Individual or company that takes the initiative to integrate both the upstream
and downstream supply chain, getting members to work cooperatively to lower total costs and achieve
greater efficiency.

Configure to Order (CTO) - Answers - customer is allowed to configure a product based on various
features and options.

- delivery lead time is reduced because there is no design time required and the different features and
options may already be available.

Engineer to Order (ETO) - Answers - unique engineered design or significant customizations.

- customer is highly involved, inventory will not normally be purchased until needed by manufacturing,
delivery time is long because it includes not only purchase lead time but also design lead time.

Assemble to Order (ATO) - Answers - product is made from standard components or options that the
manufactuer can inventory and assemble.

- delivery lead time is reduced further because there is no design time needed and inventory is held
already for assembly.

Make to Order (MTO) - Answers - manufacturing does not start making the product until an order is
received. the final product is usually made from standard items but may include custom-designed
components as well.

- delivery lead time is reduced because there is little design time required and inventory is held in raw
material

Make to Stock (MTS) - Answers - supplier manufactures the goods and sells from a finished goods
inventory.

- delivery lead time is shortest as manufacturing and assembly have already been completed. customer
has little direct involvement in the product design

Reverse Logistics - Answers The area of logistics that involves bringing goods back to the manufacturer
because of defects or for recycling materials.

Advanced Planning and Scheduling (APS) - Answers approach has often included the suppliers and
customers in the planning, thereby attempting to optimize the performance of the entire supply chain.

Capacity - Answers the quantity of work that labour and equipment can preform in a given period.

Production Activity Control (PAC) - Answers implementation and control phase of the production
planning and control system. responsible for planning and controlling the flow of work through the

, factory. the planning horizon is very short, perhaps from a day to a month. level of detail is high since it
is concerned with individual components, workstations, and orders. plans are reviewed and revised daily

Resource Bill - Answers shows the quantity of critical resources (materials, labor, and bottleneck
operations) needed to make one average unit of the product group

Sales and Operations Planning (S&OP) - Answers a process for continually revising the strategic business
plan and coordinating plans of the various departments.

- places it in a better position to plan changes.

- better management of production, inventory, and backlog

-manages change rather than reacting to changes in market conditions or the economy after they
happen

Define capacity and priority. Why are they important in production planning? - Answers finding
compromise where production runs as long as possible but priority (demand) is satisfied.

Describe each of the following plans in terms of their purpose, planning horizon, level of detail, and
planning cycle:

a. strategic plan

b. business plan

c. production plan

d. master production schedule

e. materials requirement plan

f. production activity control - Answers a. statement of the major goals and objectives the company
expects to achieve over the next 2-10 years. the plan gives general direction about how the company
hopes to achieve these objectives. responsibility of the senior management

b. each department produces its own plans to achieve the objectives set by the strategic business plan.
usually reviewed every 6 months to a year. level of detail is not high.

c. quantities of each product group that must be produced in each period, desired inventory levels,
resources of equipment, labour, and materials needed in each period, the availability of the resources
needed. the level of detail is not high also known as aggregate production plan.

what are 4 questions a good planning system must answer? - Answers 1. what are we going to make or
provide to customers?

2. what does it take to make it?

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
342
Member since
1 year
Number of followers
16
Documents
28610
Last sold
3 days ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

53 reviews

5
18
4
14
3
12
2
0
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions