100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

LEAN MANUFACTURING LATEST EXAM

Rating
-
Sold
-
Pages
7
Uploaded on
19-11-2024
Written in
2024/2025

LEAN MANUFACTURING LATEST EXAM....

Institution
LEAN MANUFACTURING
Course
LEAN MANUFACTURING









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LEAN MANUFACTURING
Course
LEAN MANUFACTURING

Document information

Uploaded on
November 19, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown

Subjects

Content preview

What is the definition of Lean?
Doing more work with fewer resources
What is Taiichi Ohno's structure of the Toyota Production System?




What are the 7 (8) forms of waste?
Taiichi Ohno’s seven forms of waste:
Transportation: Unnecessary handling of materials
Inventory: Excessive inventories
Motion: Unnecessary movement of people
Waiting: Workers waiting
Overproduction: Production of more parts than needed
Overprocessing: Unnecessary processing steps
Defects: Production of defective parts
Skill: Failure of making best use of workers*
Definition of JIT production.
Produces and delivers exactly the required number of each component to the
downstream operation in the manufacturing sequence just at the moment
when the component is needed.
What does JIT minimise?
1. Inventory
2. WIP

, 3. lead times
4. Space and money invested in WIP
What is the generic Pull System? What are the limitations?
pull the product from the system at the rate of customer demand.
- technical constraints means it may be necessary to push the product o a certain
point, identifying the push-pull decoupling point is key




What is Toyota's way of implementing a pull system in production control?
Kanban system

1. Production kanban - authorises upstream station to produce a batch of parts
2. Transport kanban - authorises transport of the parts to the downstream station
What is the objective of the SMED?
Single Minue Exchange of Dies - to reduce the average inventory level, batch
size must be reduced, to reduce the batch size, set up times must be reduced.
What is the 8 step process to reducing set up times?
1. Analyse the set-up process
2. Classify set up operations: waste (operations which do not add any value to
set up), internal set ups (operations that can only be performed while the
machine is shut down) external set ups (operations that can be performed
without shutting down the machine)
3. Eliminate waste
4. Convert as many of the internal set ups to external as possible
5. Improve internal set ups to reduce time: quick change tooling, standard base
plates, quick locate nd fit connections

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Boostertips Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
261
Member since
3 year
Number of followers
195
Documents
5175
Last sold
1 week ago

3.8

44 reviews

5
19
4
8
3
10
2
2
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions