PJM Sample Test Review Questions and Answers 100% Pass Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - ANSWER-off cost out of merit. Monitoring ___________ may give insights into system constraints. - ANSWER- Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - ANSWER-PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - ANSWER-light load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - ANSWER- During system restoration, the two categories of reserves are dynamic and spinning. - ANSWER- During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. - ANSWER- Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/20 PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. - ANSWER- A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. - ANSWER- A fossil steam unit is considered fuel limited when it is not capable of running at its maximum capacity for the next 72 hours - ANSWER- During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient load is available to stabilize unit operation. - ANSWER- A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace remain the same, frequency decrease. - ANSWER- LMPs will change when marginal generator output changes - ANSWER- The two control signals sent by the PJM E M S are regulation and dispatch rate (desired MW output). - ANSWER- An all-call is the one-way communication system used to disseminate information to market operation centers. - ANSWER- Real time bus prices may be monitored using data viewer. - ANSWER- Not offering an available PJM capacity resource into the day ahead market is a violation of PJMs two settlement market rules. - ANSWER- Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/20 A unit that fails to start when scheduled, would be classified as an unplanned outage. - ANSWER- Maximum Generation Emergency is declared by PJM when generation is required above the highest incremental economic cost. - ANSWER- Maintenance outages are permitted when a unit can be held online until the following Monday, and system reliability is not affected - ANSWER- If PJM ace shows over-generation, actual imports ar

Montrer plus Lire moins
Établissement
PJM Generation Dispatcher
Cours
PJM Generation Dispatcher










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
PJM Generation Dispatcher
Cours
PJM Generation Dispatcher

Infos sur le Document

Publié le
19 novembre 2024
Nombre de pages
20
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

PJM Sample Test Review Questions
and Answers 100% Pass

Real time transmission constraints or contingencies may be alleviated with generators

operating ______________ - ANSWER✔✔-off cost out of merit.


Monitoring ___________ may give insights into system constraints. - ANSWER✔✔-

Monitoring LMP's


PJM calls for _____________ reserves to recover ace so that tie line schedules are

maintained. - ANSWER✔✔-PJM calls on synchronized reserves


If not cancelled by PJM, the minimum generation alert expires at the end of the

specified ______________. - ANSWER✔✔-light load period


When PJM declares a hot weather alert, the generation dispatcher should determine if

maintenance can be deferred and notify all generating stations and key personnel. -

ANSWER✔✔-


During system restoration, the two categories of reserves are dynamic and spinning. -

ANSWER✔✔-


During system restoration, frequency should be maintained between 59.75 and 61.00

Hertz. - ANSWER✔✔-

Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/20

,PJM issues a heavy load voltage schedule. Member companies who own generation

facilities should ensure voltage regulators on generating units are in service &

automatic. - ANSWER✔✔-


A unit being dispatched economically by PJM should set its megawatt output based on

the unit's dispatch rate or desired megawatt level. - ANSWER✔✔-


A fossil steam unit is considered fuel limited when it is not capable of running at its

maximum capacity for the next 72 hours - ANSWER✔✔-


During system restoration prior to synchronization of a unit, the dispatcher should

ensure sufficient load is available to stabilize unit operation. - ANSWER✔✔-


A large unit in an external control area near PJM/PJM West trips. The PJM operator will

see ace remain the same, frequency decrease. - ANSWER✔✔-


LMPs will change when marginal generator output changes - ANSWER✔✔-


The two control signals sent by the PJM E M S are regulation and dispatch rate (desired

MW output). - ANSWER✔✔-


An all-call is the one-way communication system used to disseminate information to

market operation centers. - ANSWER✔✔-


Real time bus prices may be monitored using data viewer. - ANSWER✔✔-


Not offering an available PJM capacity resource into the day ahead market is a violation

of PJMs two settlement market rules. - ANSWER✔✔-
Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/20

, A unit that fails to start when scheduled, would be classified as an unplanned outage. -

ANSWER✔✔-


Maximum Generation Emergency is declared by PJM when generation is required

above the highest incremental economic cost. - ANSWER✔✔-


Maintenance outages are permitted when a unit can be held online until the following

Monday, and system reliability is not affected - ANSWER✔✔-


If PJM ace shows over-generation, actual imports are less than scheduled. -

ANSWER✔✔-


PJM will request a Supplementary Status Report when a Maximum Generation

Emergency Alert is issued. - ANSWER✔✔-


If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should be

bid at maximum emergency. - ANSWER✔✔-


The loss of a large generation unit on the PJM system can be detected by monitoring

frequency and PJM ace. - ANSWER✔✔-


A 1000 megawatt unit has tripped in the PJM control area and the PJM ace now

indicates under-generation of 1050 Megawatt. PJM should request 100% synchronized

reserves be loaded. - ANSWER✔✔-


Alerts are issued in advance of a scheduled load period to allow sufficient time for the

generation dispatcher to prepare for the anticipated capacity shortages - ANSWER✔✔-

Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/20

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
SophiaBennett Howard Community College
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
131
Membre depuis
1 année
Nombre de followers
5
Documents
9104
Dernière vente
4 jours de cela
EXAM GAME-CHANGER

Exam Questions and Answers Section : Study Like a Pro, Study Smart, Study with Sophia.

3.7

26 revues

5
10
4
5
3
7
2
1
1
3

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions