The sections in Division 01, which are collectively referred to as the General Requirements, specify
what? - Answers Administrative requirements, procedural requirements, temporary facilities and
controls,
performance requirements, and life cycle activities.
Requirements relating to the process of contract administration, the assignment of contractual
responsibilities, and the methods of communicating, controlling, and assuring quality: - Answers
Administrative and Procedural Requirements
Location in the Procurement Documents where information regarding subsurface and existing
conditions includes geotechnical reports, soil boring data, hazardous materials reports, descriptions of
the site, resource drawings of existing buildings, and property survey information can be found. -
Answers Available Information
These written documents define the requirements for products, materials, and workmanship upon
which the contract is based and requirements for administration and performance of the project. They
are generally written for each subject as sections and organized by divisions under MasterFormat or by
categories under UniFormat. - Answers Specifications
This document established by consensus that provides rules, guidelines, or characteristics for activities
or their
results as defined in the International Standards Organization/ International Electro-technical
Commission (ISO/IEC) Guide 2. They are incorporated by reference into the specifications. They are
published by trade associations, professional societies, standards-writing organizations, governments,
and institutional organizations. - Answers Reference Standards
An offer to perform a contract for work or supply materials or goods at a specific price and is a response
to a solicitation such as an invitation to bid or an advertisement for bid; - Answers Bid
This protects the owner from losing the benefit of an accepted bid and commits the bidder to enter into
a contract and, if required, provide performance and payment bonds. This is provided by the bidder at
the time of bid and is submitted with the bid and generally provides for a penal amount expressed either
in dollars or as a percentage of the total amount of the bid. In the event that the selected bidder fails or
refuses to enter into a contract for the price that was bid, the surety is obligated to pay the owner's
damages up to the penal amount of the bond. - Answers Bid Bond
Bid solicitations fall into what two categories? - Answers Invitations to Bid and Advertisements to Bid.
A bond which provides a guaranty that if the contractor defaults or fails to perform, the surety will
either complete the terms or provide sufficient funds up to the penal amount for such completion and