What should you do if you find errors on your PDE? - correct answer ✔Note
them on the printed copy, sign it, and provide It to admin personnel
How can you access your SWE PDE? - correct answer ✔Self service in
Direct Access, "View" then "SWE PDE"
Where are deadlines for PDE verifications and corrections provided? - correct
answer ✔In a message
On your PDE you will receive credit for all sea/surf/award points for your first
advancement on or after what date? - correct answer ✔01 JAN 2010
You will be credited Sea Time points on your PDE at what rate? - correct
answer ✔2 points per year or 0.166 per month
On your PDE, award points are earned up to what point? - correct answer
✔Servicewide Eligibility Date
On your PDE, TIR and TIS are computed up to what point? - correct answer
✔Terminal Eligibility Date
You have submitted an eResume but immediately notice that the Job Ranking
Preferences are incorrect. How should you make corrections? - correct
answer ✔???
Once you have chosen all desired Job Basket boxes for an eResume, what
should be your next step? - correct answer ✔???
, What should you do after ranking positions in order of preference on your
eResume? - correct answer ✔???
You have submitted an incorrect eResume. What can you do to delete the
incorrect information? - correct answer ✔???
How is risk defined within Risk Management? - correct answer ✔The
possibility of loss or injury due to exposure to a hazard
What is the first choice in the standard of order of precedence for RM
controls? - correct answer ✔Use Design and engineering solutions to
achieve minimum risk
In the RM process, what action follows an evaluation? - correct answer
✔Feedback
Which of the following is a Risk Assessment pitfall? - correct answer ✔Over
optimism, misrepresentation, alarmism, indiscrimination, prejudice,
inaccuracy, enumeration
In the first step of the Risk Management Process Cycle, "Why" analysis is
used in which action? - correct answer ✔Action 3- List Causes ("Why"
Analysis)
Develop controls is an action for which step in the RM process? - correct
answer ✔Step 3
Within the RM process, which is a type of control that can be applied to
hazards to mitigate the risk? - correct answer ✔Engineering controls,