NCCCO MOBILE CRANE EXAM
QUESTIONS AND CORRECT ANSWERS
2024/2025 GRADED A+
What action does a signal person intend the operator to perform if he extends
his arm at shoulder height, makes a fist with his hand, and stickshis/her thumb
up?
A. Boom down
B. Swing
C. Boom up
D. Extend boom - ANSWER- c.
When hoisting personnel, within what percentage of level must a telescopic
boom crane be in order for the gross ratings in the load chart toremain valid?
A. 1%
B. 2%
C. 5%
D. 8% - ANSWER- a.
,The load line of the crane you're operating contacts an energized powerline.
There's no sign of any other danger, such as fire. What should you do?
A. Climb down carefully from the crane cab
B. Jump down, feet together
C. Stay in the cab until the lines are de-energized
D. Get as far away from the crane as possible - ANSWER- c.
According to OSHA 1926.1413, how many randomly distributed brokenwires in
rotation-resistant rope are cause for replacement of the rope?
A. 1 broken wire in 6 rope diameters
B. 2 broken wires in 30 rope diameters
C. 3 broken wires in one strand in one lay
D. 2 broken wires in 6 rope diameters - ANSWER- d.
What is the net capacity of a crane on main boom unless the
manufacturer states otherwise?
A. The capacity listed in the load chart minus the weight of the rigging andall
attachments
B. The capacity listed in the load chart plus the weight of the rigging and all
attachments
C. The capacity listed in the load chart minus the weight of the rigging andall
attachments not in use
D. The capacity listed in the load chart minus the weight of the rigging alone
• ANSWER- a.
What may happen to a properly rigged load when lifted off the groundunless
the operator takes account of boom deflection?
, A. It could swing out away from the crane
B. It could swing in towards the crane
C. It could raise absolutely vertically
D. It could shift in its rigging - ANSWER- a.
What Standard Method hand signal is being illustrated?
A. Swing
B. Stop
C. Emergency Stop
D. Travel - ANSWER- a.
Who should an operator respond to a "stop" signal from?
A. Appointed signal person only
B. Project manager only
C. Superintendent only
D. Anyone - ANSWER- d.
Which area do truck cranes without a 5th outrigger generally have nolifting
capacity unless the manufacturer states otherwise?
A. The side
B. The rear
C. The front
D. The outriggers - ANSWER- c.