Answers
If the lower assessed level of control risk approach preliminary audit strategy is used, planned detection risk will be:
- Course
- Institution
1. If the predominantly substantive approach preliminary audit strategy is used, planned detection risk will be: moderate or high. at the higher level. high or very high. low or very low. The correct option is . Feedback: Section 12.2 Determining detection risk 2. If the lower...
[Show more]