100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

PRM3701 Assignment 6 (COMPLETE ANSWERS) Semester 2 2024 (705306) - DUE 1 October 2024

Beoordeling
-
Verkocht
-
Pagina's
23
Cijfer
A+
Geüpload op
22-09-2024
Geschreven in
2024/2025

PRM3701 Assignment 6 (COMPLETE ANSWERS) Semester 2 2024 (705306) - DUE 1 October 2024 QUESTION 1 [15 MARKS] You have been invited to deliver a speech to young graduates about important issues in project management. To educate them properly answer the questions that follow. • Please note you will be required to do research on the questions below. • Also indicate your references 1.1 Discuss five constraints, besides a project budget, that a project manager must balance to successfully complete a project. (5 marks) 1.2 Describe each phase of the project life cycle, referring to two core activities that usually occur in each phase. (10 marks) QUESTION 2 [20 MARKS] The Department of Business Management has developed a plan for a business clinic project in the conference rooms of four selected hotels in Mamelodi Township. The workshops aim to benefit 400 small business owners, facilitated by lecturers and postgraduate students, running 8 hours a day (except weekends) during September 2017. Business skills will be developed, marketing support will be provided, and business manuals and starter packs will be distributed to attendees. The objective is to improve business management skills in a turbulent environment. Develop a project charter by explaining the elements that form part of a project charter. Thereafter, provide specific practical examples for each of these elements based on the business clinic project. PRM3701_ASSIGNMENT 6_SEMESTER 2_2024 QUESTION 3 [20 MARKS] As a project manager for Nando’s you must manage a project with activities and their respective durations as listed in the table below: Activity Immediate Predecessor Duration (months) A None 2 B A 4 C A 2 D B 2 E B, C 4 F A, E 6 G D 4 H D, E, F 2 I G, H 6 J H, F 6 K H, I, J 4 PRM3701_ASSIGNMENT 6_SEMESTER 2_2024 3.1 Construct a network diagram to analyses your project. NB: The network diagram needs to have all the values otherwise zero marks will be awarded Answer: PRM3701_ASSIGNMENT 6_SEMESTER 2_2024 3.2 What is the total project duration time? (1) Answer: 3.3 Identify the critical path on your network diagram. (1) Answer: 3.4 When is the latest time that activity G must be completed in order not to experience any delays in the project? (1) Answer: 3.5 What is the earliest time that activity D can possibly

Meer zien Lees minder
Instelling
Vak










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
22 september 2024
Aantal pagina's
23
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

PRM3701

Assignment 6 (VERIFIED ANSWERS)

Semester 2 2024 (705306) - DUE 1 October

2024

, Course
Project Management (PRM3701)
Institution
University Of South Africa (Unisa)
Book
Project Management
QUESTION 1

1.1 Five Constraints in Project Management

To ensure that a project is completed successfully, it is necessary to carefully
balance several restrictions. Aside from money constraints, project managers
must deal with a number of other constraints that might have an impact on
project development and outcomes. Here are five essential restrictions that
project managers need to balance-

1. SCOPE

, A project's scope describes its particular objectives, outputs, and characteristics.
Scope creep, or the uncontrolled increase of a project's scope without
corresponding changes in time, budget, or resources, can have a negative impact
on project success. Clearly identifying project objectives, establishing
boundaries, and making sure that any changes are officially accepted through a
change management procedure are all part of managing scope. Project managers
must collaborate extensively with stakeholders to maintain an in-depth
understanding of the project's requirements and keep the team focused on the
established deliverables
.

2. TIME

In each activity, time is a vital limitation. A project's success is frequently judged
by its ability to meet deadlines and finish tasks on time. Delays in one aspect of
the project might cause a domino effect, affecting other dependent operations and
lengthening the overall project duration. To effectively manage time, project
managers must create precise timetables, routinely check progress, and alter
timelines as needed to accommodate for unexpected delays. Setting realistic
deadlines, employing tools like Gantt charts and the Critical Path Method of
Management (CPM), and prioritizing activities to keep the project on track are all
indications of effective time management.

3. Quality

Meeting the standards and requirements for the project deliverables is the main
emphasis of the quality constraint. High-quality results are vital for meeting
customer expectations and project objectives. However, achieving quality often
involves more time, resources, or money, which can interfere with other project
limitations. Establish quality control and assurance procedures throughout the
project's lifecycle. Regular testing, inspections, and reviews are essential for
making certain the project output satisfies the specified standards while
remaining within other limits.

4. Resources

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
masterstudy University of South Africa (Unisa)
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1820
Lid sinds
1 jaar
Aantal volgers
75
Documenten
6445
Laatst verkocht
6 dagen geleden

4.6

290 beoordelingen

5
230
4
33
3
13
2
8
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen