First statewide regulation of the OSSF year - ANSWER 1989
TNRCC - ANSWER Texas Natural Resource Conservation Commission.
OSSF cannot produce more than - ANSWER 5000 gallons per day.
The TCEQ has allowed a local government body to implement and enforce
OSSF.
The authorized agent includes ANSWER Cities, counties, river authorities, and
special districts including water and municipal utility districts.
Ten-acre rule - ANSWER If you possess 10 acres or more, you may be exempt
from permissions (authorized agents, municipal legislation).
Who can build their own system? ANSWER: Single-family homeowners.
Installer 1 credentials - ANSWER: No experience.
Installer 11 qualification - ANSWER Document
nted experience.
One year as an installer. 1 and 3 i
nstallations.
Two years as an apprentice, six installations.
How to document experience for installation II - ANSWER -statements from
non-related clients or DR
-statement from the supervising installer or the DR
Designated Representative Qualifications - ANSWER No experience
, Designated by an authorized agency.
Site evaluator qualifications - ANSWER Possess any of the following.
- Installer II
-DR
-PE
-RS
-A professional geoscientist license in soil science.
Maintenance provider - ANSWER Hold a current installer 2 license, Class C
wastewater license, or present acceptable verification of three years of
experience as a main technician.
The most significant component of the DR's function is to issue authority to
construct.
What needs to be planned by a PE or RS? Subdivisions, several systems on the
same piece of land, small lots, variance requested, Edwards Aquifer, RV parks,
all proprietary, aerobic, and any surface application.
Authorization to construct is good for - ANSWER one year.
Application Time Frame - ANSWER Must be granted or denied within thirty
days.
The primary goal of the OSSF program is to protect public health and the
environment from potential waterborne diseases.
Acceptable security methods to prevent unwanted entrance - ANSWER:
padlock
UPDATED
First statewide regulation of the OSSF year - ANSWER 1989
TNRCC - ANSWER Texas Natural Resource Conservation Commission.
OSSF cannot produce more than - ANSWER 5000 gallons per day.
The TCEQ has allowed a local government body to implement and enforce
OSSF.
The authorized agent includes ANSWER Cities, counties, river authorities, and
special districts including water and municipal utility districts.
Ten-acre rule - ANSWER If you possess 10 acres or more, you may be exempt
from permissions (authorized agents, municipal legislation).
Who can build their own system? ANSWER: Single-family homeowners.
Installer 1 credentials - ANSWER: No experience.
Installer 11 qualification - ANSWER Document
nted experience.
One year as an installer. 1 and 3 i
nstallations.
Two years as an apprentice, six installations.
How to document experience for installation II - ANSWER -statements from
non-related clients or DR
-statement from the supervising installer or the DR
Designated Representative Qualifications - ANSWER No experience
, Designated by an authorized agency.
Site evaluator qualifications - ANSWER Possess any of the following.
- Installer II
-DR
-PE
-RS
-A professional geoscientist license in soil science.
Maintenance provider - ANSWER Hold a current installer 2 license, Class C
wastewater license, or present acceptable verification of three years of
experience as a main technician.
The most significant component of the DR's function is to issue authority to
construct.
What needs to be planned by a PE or RS? Subdivisions, several systems on the
same piece of land, small lots, variance requested, Edwards Aquifer, RV parks,
all proprietary, aerobic, and any surface application.
Authorization to construct is good for - ANSWER one year.
Application Time Frame - ANSWER Must be granted or denied within thirty
days.
The primary goal of the OSSF program is to protect public health and the
environment from potential waterborne diseases.
Acceptable security methods to prevent unwanted entrance - ANSWER:
padlock