100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDT COMPREHENSIVE EXAM AND PRACTICE EXAM

Rating
-
Sold
-
Pages
29
Grade
A+
Uploaded on
18-09-2024
Written in
2024/2025

CDT COMPREHENSIVE EXAM AND PRACTICE EXAM

Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Course

Document information

Uploaded on
September 18, 2024
Number of pages
29
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CDT COMPREHENSIVE EXAM AND PRACTICE EXAM
NEWEST 2024 ACTUAL EXAM COMPLETE 250
QUESTIONS AND CORECT DETAILED ANSWERS
(VERIFIED ANSWERS) |ALREADY GRADED A+

Which of these documents, might we find in the
Project Manual but they are not contract documents?

(A) The Agreement
(B) Procurement Documents
(C) Addendum
(D) Supplemental Conditions - ANSWER: Answer: B

Reference: PDPG 11.1.6

Explanation: Procurement requirements are
addressed to prospective bidders or proposers
interested in the project. Although not necessarily
part of a contract, the procurement requirements are
usually bound with other written construction
documents into a project manual.

Before a model building code can become the
building code for a jurisdiction, it has to be adopted
by?

(A) Authority Having Jurisdiction
(B) State Government
(C) Building Inspector
(D) International Organization for
Standardization - ANSWER: Answer: A

Reference: PDPG 4.3

Explanation: Before a model building code can
become the building code for a jurisdiction, it has to
be adopted by that AHJ. Once adopted, they then
are responsible for enforcing that building code
within their jurisdiction.

The Construction Manager is hired by this entity?

(A) The General contractor
(B) Owner
(C) A/E

,(D) Contract Administrator - ANSWER: Answer: B

Reference: PDPG 2.6.4

Explanation: The owner usually engages the
services of a construction manager, an entity that
typically contracts with the owner to provide
construction management services.

The parties to the Construction Agreement are?

(A) General Contractor, Sub Contractor, and
Construction Manager
(B) A/E, General Contractor, and Contract
Administrator
(C) Building Official, and General contractor
(D) Owner, Contractor, and A/E - ANSWER: Answer: D

Reference: PDPG 7.2.3.1

Explanation: (PDPG Figure 5.1) The tripartite relationship among the owner,
contractor,
and A/E is created by obligations to third parties to the contract. For example, the
owner-A/E agreement may require certain duties of the A/E acting on behalf of the
owner
during construction. The contractor has a right to rely on the proper performance of
these
duties. The A/E, similarly, relies on the contractor to perform certain duties
identified in
the owner-contractor agreement, even though the A/E is not a party to that
contract. The
A/E relationship to the contractor in the owner-contractor agreement is a third-party
relationship. These third-party relationships create the third side of the triangle in
the
construction process.(PDPG 7.2.3.1) The owner contracts first with the A/E to design
the
project and to prepare bidding documents. The owner then obtains bids through the
competitive bidding process from bidding contractors. When one of he bidders is
selected
by the owner, the owner will either directly enter into the contract (such as for a
project to
be constructed with public funds), or negotiate the final cost and then enter into the
contract (such as for a privately funded project).

The organization responsible for the General
Conditions known as 201 are?

, (A) DBIA
(B) AGC
(C) AIA
(D) CSI - ANSWER: Answer: C

Reference: PDPG 11.5.4.2

Explanation: Each document deals with project
conditions and issues in a similar manner but with
language determined to be in accord with the needs
of each organization.

When there is a dispute between the specifications
and the drawings, what is the proper way to settle
the dispute?

(A) The drawings have priority
(B) The A/E should interpret
(C) The specifications
(D) Arbitration - ANSWER: Answer: B

Reference: PDPG 11.2.9.4, 13.9.1.1, AIA A201 1.2.1

Explanation: The drawings and specification are complementary documents in
the AIA and EJCDC general conditions. (PDPG 11.2.9.4) Precedence: Questions
of precedence often arise among large scale drawings, small-scale drawings, and
specifications. However, the use of statements in the project manual to establish
the precedence of the various contract documents is not recommended because
the documents are complementary. The general conditions of the contract should
indicate only that in a case of conflict between drawings and specifications, the
A/E will make a documented interpretation. (PDPG 13.9.1.1) When the contract
documents are being interpreted, the contents of the drawings and the
specifications must be considered together. If an item is not addressed in both the
drawings and the specifications, it does not mean that it is not required for the
project. (AIA A201 1.2.1) The Contract Documents are complementary, and what
is required by one shall be as binding as if required by all

A subcontractor is obligated to the prime contractor
in the same manner as the prime contractor is
obligated to the:

(A) Architect
(B) Owner
(C) Material Supplier
(D) Principal in Charge - ANSWER: Answer: B

Reference: PDPG 2.4.2 , 2.5
$17.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
maxmaxwellmm254 University College Maastricht
Follow You need to be logged in order to follow users or courses
Sold
9
Member since
1 year
Number of followers
1
Documents
839
Last sold
3 months ago
EXCELLENT HOMEWORK

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why i'm one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Read more Read less
4.9

135 reviews

5
123
4
11
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions