Project Management in Practice, 7th Edition by Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest Version

Document preview thumbnail
Preview 2 out of 5 pages

Project Management in Practice, 7th Edition by Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest Version

Content preview

TEST BANK For Project Management in Practice, 7th Edition by
Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest
Version
In the _____________ stage of the project life cycle project the product is delivered
to the customer and resources are reassigned. - ANSWER: closing

Which structure would be most appropriate for developing a new, highly innovative
product that has strict time constraints? - ANSWER: Dedicated project team

_________ organization is a hybrid form in which a horizontal project management
structure is "overlaid" in the normal functional hierarchy. - ANSWER: Matrix

Regardless of the criteria differences among different types of projects, the most
important criterion for project selection is - ANSWER: The projects fit for
organizational strategy

Which of the following is NOT one of the requirements for successful
implementation of strategies through projects?

A. Allocation of resources
B. Prioritizing of projects
C. Motivation of project contributor
D. Adequate planning and control systems - ANSWER: ALL OF THESE

Which of the following terms is often used to denote a project that a powerful, high-
ranking official is advocating? - ANSWER: Sacred Cow

The assessment of the external and internal environments is called _______ analysis
- ANSWER: SWOT analysis

Which of the following would be classified as an organizational threat? - ANSWER:
Slowing of the economy

Which dimension of project management centers on creating a temporary social
system within a larger organizational environment that combines the talents of a
divergent set of professionals working to complete the project? - ANSWER:
Sociocultural

What are characteristics of effective objectives? - ANSWER: Specifc Measurable
Achievable Realistic Time-Bound (SMART)

Project Management is ideally suited for a business environment that has all of the
following except?

, A) Accountability
B) Flexibility
C) Innovation
D) Speed
E) Repeatability - ANSWER: Repeatability

Which are the three different matrix systems? - ANSWER: Weak, Strong, Balanced

What are problems associated with the absence of a project portfolio system? -
ANSWER: Organizational politics, Resource conflicts, Multitasking, Implementation
gap

What are technical and social dimensions of project management? - ANSWER:
Technical Dimensions= Scope, WBS, Schedules, Resource allocation, baseline
budgets, status reports

Finacial criteria - ANSWER: Financial criteria is the preferred method to evaluate
projects. These models are appropriate when there is a high level of confidence
associated with the estimates of future cash glows. The two models are payback and
net present value (NPV)

Non financial Criteria - ANSWER: Companies have to be disciplined in saying no to
potentially profitable projects that are outside the realm of their core mission. This
requires other criteria be considered beyond direct financial return.

The structure that manages projects within the existing organizational structure is
__________ organization - ANSWER: Functional

What combinations represent the extremes of project organization? - ANSWER:
Functional and project organizations

What organization structure is the balance of authority strongly in favor of the
functional managers? - ANSWER: Weak Matrix

Which is NOT a driving force behind the increasing demand for project
management?

A. Compression of the product life cycle
B. Knowledge explosion
C. Increasing need for multi-project management
D. More sustainable business practices
E. Declining need for product management - ANSWER: E. Declining need for product
management

A project team that operates with a full-time project manager as a separate unit
from the rest of the organization is structured using ________ organization -
ANSWER: Projectized

Connected book
 image
Jack R. Meredith, Scott M. Shafer, Samuel J. Mantel, Jr., Margaret M. Sutton Project Management in Practice
Edition: 2020 ISBN: 9781119702962 Edition: Unknown

Document information

Uploaded on
September 6, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
3
Followers
0
Items
1282
Last sold
10 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions