Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Project Management in Practice, 7th Edition by Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest Version

Document preview thumbnail
Preview 2 out of 6 pages

Project Management in Practice, 7th Edition by Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest Version

Content preview

TEST BANK For Project Management in Practice, 7th Edition by
Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest
Version
Two teams working through a project conflict seek a win/win solution. Which conflict
strategy should they employ? - ANSWER: Collaborate/Problem-solve

A construction company wants to follow proper processes for projects and their
documentation. Which document serves as the official authorization for a project? -
ANSWER: Project Charter

Which parts of a project plan are interdependent during the planning phase? -
ANSWER: Schedule, Scope, and Budget

A project to build a new library is behind schedule. Which adjustment to the project
plan will have the best chance of putting the schedule back on track? - ANSWER:
Removing a task to plant a garden

A project manager receives a suggestion for an app feature that was not part of the
original development scoping. What should be the first step taken to add it to the
project scope? - ANSWER: Identify a change request

A new project manager wants to know why closing contracts is an important part of
the closing phase. What is the overall purpose? - ANSWER: To ensure work has been
completed accurately and satisfactorily

Which project is utilizing a predictive approach?

1. A garden area that has a defined space and number of plants to be planted, but
the time frame of the building is not set.

2. A science lab where the specifications of the lab can be defined and adjusted once
the core of the lab is built.

3. A building wing where all the specifications for the classrooms are defined up
front and any changes to the specifications have to go through a change control
board.

4. A playground with multiple areas, each with its own individual project, with
multiple fixed scopes, but the overall project is subject to change. - ANSWER: A
building wing where all the specifications for the classrooms are defined up front
and any changes to the specifications have to go through a change control board.

, Which type of project authority is based on comprehensive respect for a manager's
knowledge and leadership abilities, even if the manager is not a subject matter
expert on the actual work to be done? - ANSWER: Reverent

In building a new kitchen for a cafeteria, a stove and the vent above the stove can be
worked on simultaneously. The vent above the stove needs to be in place before the
stove can be tested as part of its completion. Which type of dependency exists
between the vent and the stove task? - ANSWER: Finish-finish

For the construction of new stands inside a gymnasium, which project task is
considered to be a procurement? - ANSWER: Obtaining the wood to build the stands

What is the order of the phases that comprise the project life cycle? - ANSWER: 1.
Initiating
2. Planning
3. Executing
4. Monitoring and Controlling
5.Closing

A new hire is assigned to a team addressing a product backlog. What will this person
be working on? - ANSWER: A list of prioritized tasks for a sprint within a project

Which project situation best lends itself to a hybrid approach?

1. A gym space with modular sections

2. A community garden

3. A financial software project built to regulations

4. A healthcare software project built to regulations - ANSWER: A gym space with
modular sections

A software development project has had many aspects added that were not
approved, nor were they presented to a change control board. As a result, the
project will take longer and there is an aggregate risk it will not be done on time.
What has taken place in the project? - ANSWER: Scope creep

A development team discovered a faster way to review code without sacrificing
quality. What should be done during the closing phase? - ANSWER: Archive the
newly discovered process for future projects

For each project scenario, indicate whether the project best fits a predictive,
adaptive, or hybrid approach.

1. Building an airplane

Connected book
 image
Jack R. Meredith, Scott M. Shafer, Samuel J. Mantel, Jr., Margaret M. Sutton Project Management in Practice
Edition: 2020 ISBN: 9781119702962 Edition: Unknown

Document information

Uploaded on
September 6, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
3
Followers
0
Items
1282
Last sold
10 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions