CMP 101 Final Exam Questions and Answers All Correct What are the components of the construction contract? - Primary Specifications - Secondary Specifications - None of these - General Specifications - Plans and Specifications - Answer-Plans and Specifications Which of the following construction plans will show light fixtures and their switches? - Mechanical - Electrical - None of these - Civil - Architectural - Answer-Electrical A Construction Manager would perform the following functions as a part of 'Monitoring Project Performance' - Ensure that all portable toilets are functioning for workers to use. - Ensure the architect has completed all construction drawings - Ensure the project cost is within owner's budget - Ensure that work orders are given to sub-contractors - Ensure the project is proceeding as per the schedule - Answer-- Ensure the project cost is within owner's budget - Ensure the project is proceeding as per the schedule Details regarding concrete beams that support the loads on the building will be shown on the __________________plans - Architectural - Plumbing - Civil - Structural - Electrical - Answer-Structural Once the owner occupies the home, they can call the contractor to come in and fix any issues as long as the home is under the ________________stage - Commissioning - Final Inspection - Design - Warranty - None of these - Answer-Warranty

Mehr anzeigen Weniger lesen
Hochschule
CMP 101
Kurs
CMP 101










Ups! Dein Dokument kann gerade nicht geladen werden. Versuch es erneut oder kontaktiere den Support.

Schule, Studium & Fach

Hochschule
CMP 101
Kurs
CMP 101

Dokument Information

Hochgeladen auf
1. september 2024
Anzahl der Seiten
16
geschrieben in
2024/2025
Typ
Prüfung
Enthält
Fragen & Antworten

Themen

Inhaltsvorschau

CMP 101 Final Exam Questions
and Answers All Correct
What are the components of the construction contract?
- Primary Specifications
- Secondary Specifications
- None of these
- General Specifications
- Plans and Specifications - Answer-Plans and Specifications

Which of the following construction plans will show light fixtures and their switches?
- Mechanical
- Electrical
- None of these
- Civil
- Architectural - Answer-Electrical

A Construction Manager would perform the following functions as a part of 'Monitoring
Project Performance'
- Ensure that all portable toilets are functioning for workers to use.
- Ensure the architect has completed all construction drawings
- Ensure the project cost is within owner's budget
- Ensure that work orders are given to sub-contractors
- Ensure the project is proceeding as per the schedule - Answer-- Ensure the project
cost is within owner's budget
- Ensure the project is proceeding as per the schedule

Details regarding concrete beams that support the loads on the building will be shown
on the __________________plans
- Architectural
- Plumbing
- Civil
- Structural
- Electrical - Answer-Structural

Once the owner occupies the home, they can call the contractor to come in and fix any
issues as long as the home is under the ________________stage
- Commissioning
- Final Inspection
- Design
- Warranty

,- None of these - Answer-Warranty

In order to start pouring concrete for concrete footings, following steps must be
complete:
(SELECT ALL THAT APPLY)
- Installation of CMU foundation wall
- Installation of Floor Joists
- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation - Answer-- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation

Electrical plans are labelled in the title box as _________________for the first electrical
plan:
- A1
- M1
- E1
- P1
- S1 - Answer-E1

In this type of contract, the owner and architect provide the constructor the estimated
quantities of defined items of work.
- Value-Added Contract
- Unit-Price Contract
- Cost-Plus Fee
- Lump-Sum Contract
- None of these - Answer-Unit-Price Contract

The amount that a buyer pays to purchase a house is known as _____________
- Value
- Cost
- None of these
- Price - Answer-Price

Design and Construction Phases can overlap in the following project delivery method
- Integrated Project Delivery
- CM Agency
- At-Risk CM
- All of these
- Design - Build - Answer-All of these

Each site build project is a ________________________.
- duplicate of the last one using the same plans and specs.

, - civil endeavor
- Prototype
- A and B are correct
- A and C are correct - Answer-Prototype


As a construction manager for a road construction project, you would perform the
following tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - Answer-- Hire skilled workers to perform the
construction work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time

For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - Answer-Building and Non-building
construction

GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - Answer-General Contractor

On a NON-RESIDENTIAL construction project, the Owner may directly hire the
following entities:
(SELECT ALL THAT APPLY)
- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - Answer-- Architect
- Construction Manager

On a residential construction project from the following construction activities, what
activity would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - Answer-Excavation for foundation

Lerne den Verkäufer kennen

Seller avatar
Bewertungen des Ansehens basieren auf der Anzahl der Dokumente, die ein Verkäufer gegen eine Gebühr verkauft hat, und den Bewertungen, die er für diese Dokumente erhalten hat. Es gibt drei Stufen: Bronze, Silber und Gold. Je besser das Ansehen eines Verkäufers ist, desto mehr kannst du dich auf die Qualität der Arbeiten verlassen.
Scholarsstudyguide nursing
Profil betrachten
Folgen Sie müssen sich einloggen, um Studenten oder Kursen zu folgen.
Verkauft
782
Mitglied seit
3 Jahren
Anzahl der Follower
475
Dokumente
15262
Zuletzt verkauft
4 Jahren vor
NURSING

Here you will find everything you need in nursing Assignments, EXAMS AND TESTBANKS. For students who want to see results twice as fast. I strive for my content to be of the highest quality. Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

3.9

164 rezensionen

5
87
4
21
3
26
2
6
1
24

Kürzlich von dir angesehen.

Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Häufig gestellte Fragen