100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

AVIXA CTS Sample Questions with 100 % correct Answers | Verified | A+

Beoordeling
-
Verkocht
-
Pagina's
18
Cijfer
A+
Geüpload op
25-08-2024
Geschreven in
2024/2025

On Friday afternoons. - As part of regular system maintenance, when is the BEST time to update device firmware? -On Friday afternoons. -As soon as updates are available. -Device firmware should never be updated after system sign-off. -After coordination with the client, and when the system will be available for an extended period of time Design phase - When working with a client to design an AV solution for a new conference center, the client requests a detailed budget for the equipment and installation. In what phase does this occur? -Design phase -Program phase -Bidding phase -Installation phase Speak with the client about getting more information on how to address the noise source - While surveying a conference room for a system upgrade, an engineer measures 55 dB SPL A-wtd of ambient noise when the room is empty. How should they proceed? -Add voice lift to the system proposal -Add more loudspeakers to the system proposal -Speak with the client about getting more information on how to address the noise source -Do nothing, this level of ambient noise is well within system tolerance Use an RT60 meter - What is the BEST way to determine how reverberant a space is? -Clap your hands and listen for an echo -Ask the client if anyone has complained that the room is too noisy -Use an RT60 meter -Use a DB SPL meter Site survey - The correct time to discuss visible finishes for wall plates, surface mount speakers, and wall mounted screen casings is during the:-Ordering -Installation -Site survey -Contract award Divisible room - A client needs to add videoconferencing functionality for high-level, private meetings. Which of following planned space types should you advise be ruled out? -Divisible room -Boardroom -Conference room -Classroom The Design Phase - Which phase of an AV project comes immediately AFTER the Program Phase? - The Design Phase -Project Planning and Coordination Phase -The Verification Phase -The Documentation Phase Detailed list of equipment - Which is NOT presented in the program report: -Executive Summary - Detailed list of equipment -Budgets -Infrastructure Considerations An overview of the programming process including who was surveyed during the process. - When preparing an executive summary what should be included for submittal to the client? -A deep dive, including full technical specficiation, of all equipment to be used in the design. -An estimation of how many change orders might be required if the client doesn't use your design. -References to new and emerging technologies that should be considered for future spaces. -An overview of the programming process including who was surveyed during the process. Additive color system - Which system is used to show colors from a video display?-Additive color system -Subtractive color system -Plus/minus color system -Recover color system 25 db - An installed audio system should be AT LEAST __________ above the ambient noise floor. -5 dB -25 dB -45 dB -75 dB RS-232 - A device is controlled using the pictured cable. What is the MOST LIKELY method of controlling this device? -IR -RF -RS-232 -Network 5:1 - The minimum load safety rating for mounting audio visual equipment is: -3:1 -5:1 -8:1 -10:1 Black Level - The brightness controls on a display adjusts which level? -Black Level -Chroma Level -Hue -White LevelSpot Photometer - When verifying a display system, which of the following should be used to determine if it meets a specified contrast ratio? -Multi-meter -Histogram -Lux Capacitor -Spot Photometer

Meer zien Lees minder
Instelling
AVIXA CTS
Vak
AVIXA CTS










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
AVIXA CTS
Vak
AVIXA CTS

Documentinformatie

Geüpload op
25 augustus 2024
Aantal pagina's
18
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

AVIXA CTS Sample Questions
On Friday afternoons. - As part of regular system maintenance, when is the BEST time to update
device firmware?

-On Friday afternoons.

-As soon as updates are available.

-Device firmware should never be updated after system sign-off.

-After coordination with the client, and when the system will be available for an extended period of time



Design phase - When working with a client to design an AV solution for a new conference center,
the client requests a detailed budget for the equipment and installation. In what phase does this occur?

-Design phase

-Program phase

-Bidding phase

-Installation phase



Speak with the client about getting more information on how to address the noise source - While
surveying a conference room for a system upgrade, an engineer measures 55 dB SPL A-wtd of ambient
noise when the room is empty. How should they proceed? -Add voice lift to the system proposal

-Add more loudspeakers to the system proposal

-Speak with the client about getting more information on how to address the noise source

-Do nothing, this level of ambient noise is well within system tolerance

Use an RT60 meter - What is the BEST way to determine how reverberant a space is?

-Clap your hands and listen for an echo

-Ask the client if anyone has complained that the room is too noisy

-Use an RT60 meter

-Use a DB SPL meter



Site survey - The correct time to discuss visible finishes for wall plates, surface mount speakers,
and wall mounted screen casings is during the:

,-Ordering

-Installation

-Site survey

-Contract award




Divisible room - A client needs to add videoconferencing functionality for high-level, private
meetings. Which of following planned space types should you advise be ruled out?

-Divisible room

-Boardroom

-Conference room -Classroom



The Design Phase - Which phase of an AV project comes immediately AFTER the Program Phase? -
The Design Phase

-Project Planning and Coordination Phase

-The Verification Phase

-The Documentation Phase



Detailed list of equipment - Which is NOT presented in the program report: -Executive Summary -
Detailed list of equipment -Budgets

-Infrastructure Considerations



An overview of the programming process including who was surveyed during the process. - When
preparing an executive summary what should be included for submittal to the client?

-A deep dive, including full technical specficiation, of all equipment to be used in the design.

-An estimation of how many change orders might be required if the client doesn't use your design.

-References to new and emerging technologies that should be considered for future spaces.

-An overview of the programming process including who was surveyed during the process.



Additive color system - Which system is used to show colors from a video display?

, -Additive color system -Subtractive color system -Plus/minus color system -Recover color system



25 db - An installed audio system should be AT LEAST __________ above the ambient noise floor.

-5 dB

-25 dB

-45 dB

-75 dB



RS-232 - A device is controlled using the pictured cable. What is the MOST LIKELY method of
controlling this device?

-IR

-RF

-RS-232

-Network



5:1 - The minimum load safety rating for mounting audio visual equipment is:

-3:1

-5:1

-8:1

-10:1




Black Level - The brightness controls on a display adjusts which level?

-Black Level

-Chroma Level

-Hue

-White Level

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
PatrickKaylian Delaware State University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1821
Lid sinds
2 jaar
Aantal volgers
1044
Documenten
22126
Laatst verkocht
8 uur geleden

3.8

317 beoordelingen

5
147
4
60
3
54
2
16
1
40

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen