100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Fire Pump Study Guide Questions with Correct Answers.

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
17-08-2024
Written in
2024/2025

Fire Pump Study Guide Questions with Correct Answers.

Institution
Cal Fire
Course
Cal Fire









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Cal Fire
Course
Cal Fire

Document information

Uploaded on
August 17, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Fire Pump Study Guide Questions with Correct
Answers
Heat exchangers shall be checked for _______ water flow Correct
Answer-Cooling


All alarm pilot lights should be in what state? Correct Answer-Off


There are two requirements listed under pump house conditions, choose
both listed below Correct Answer-Ventilating louvers are free to
operate,
Heat is adequate, not less than 40F for diesel pump rooms


Weekly inspection requires verification that the pump suction discharge
and bypass valves should be fully open? Correct Answer-True


When verifying the electrical system conditions, the controller pilot light
should be? Correct Answer-Illuminated


Diesel engine fuel tank level, float switch and solenoid valve operation
shall be checked Correct Answer-Weekly


What fire pump type do you record the time to crank? Correct Answer-
Diesel

, The pertinent visual observation categories required to be inspected
weekly checklists are? Correct Answer-Pump house conditions, Pump
system conditions, electrical system conditions, diesel engine system
conditions, steam system conditions


The purpose of inspecting the pump assembly? Correct Answer-Appears
to be in operating condition and is free from physical damage


The transfer switch normal pilot light should be illuminated Correct
Answer-True


The isolating switch for electric pumps should be closed. Correct
Answer-True


Pump packing boxes, bearings and casing shall be checked for Correct
Answer-Overheating


The reverse phase alarm pilot light for electric pumps should be off
Correct Answer-True


The purpose of testing the pump assembly is to ensure automatic and
manual operation upon demand and continuous delivery of the required
system output. An additional purpose is to detect Correct Answer-
Deficiencies not evident by inspection


The normal phase rotation pilot light should be on Correct Answer-True

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2022
Member since
3 year
Number of followers
1344
Documents
47128
Last sold
5 days ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

369 reviews

5
162
4
84
3
52
2
22
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions