100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

2a MA hoisting license questions with complete solutions.

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
01-08-2024
Written in
2024/2025

2a MA hoisting license questions with complete solutions.

Institution
Hoisting
Course
Hoisting










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Hoisting
Course
Hoisting

Document information

Uploaded on
August 1, 2024
Number of pages
23
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1 /232a Hoisting license Questions And Answers
1.What is the purpose of the swing gear on an excavator: answer- It connects the car body to the tracks
2.Who is responisble for inspecting a trench before anyone goes in it: answer- The equipment operator
3.What is the prefered sling angle: answer- 60*
4.The top of the spoil pile is called: answer- The crown
5.A four footbdeep trench requires an additional ladder for each _ of open trench: answer- 25ft
6.Materials mist be kept back from the edge of the trenxh a minimum of: answer- Two feet
7.When can inspector revoke a hoistinf licence: answer- Failure to pay excise tax
8.Who developed the ma crane hand signals: answer- Ansi / asme
9.Dot stands for: answer- Department of transportion
10.When do you do your walk around of the equpiment: answer- Before you 2 /23start it
11.In the one to one sloping ratio what does the 2nd one represent: Depth or verticle rise
12.On a track machine the gears should be where: In the rear
13.When load leveling when do you deploy your stablizers: Before you make the lift
14.When backfilling an excavation you should use a: Small lift , shade the ditch
15.In the state of MA what criteria require a hoisting license: More than 500lbs Height greater than 10ft
Bucket bigger than 1/4 yard
16.What tyoe of saftey system isnused on de-energized circuts: Lockout tag out total de energization
17.In what time should you contact departmant of public safety if a death occurs: Withen one hour
18.How many lbs in 1 ton: 2000
19.All welding and cutting on hoistinf equipment shall be done in acco-
radance with the requirments of what: Aws Asme codes
20.What items should be checked on a daily basis: Fluid levels, hoses tires 3 /23belts horn backup system brakes and controls
21.What action does a signal person intend the operator to preform if he extends his arm at shoulder height makes a fist with his hands and sticks his thumb up: Boom up
22.What type of protections should be given to operators: Protection from weather
Saftey glass
$10.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ngina112

Get to know the seller

Seller avatar
ngina112 Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
0
Documents
18
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions