CQM-C Verified Latest Update 2024
A cumulative list of job deficiencies/rework items can be found in: - ANSWER-A deficiency tracking system/reworks items list. Actual construction on the job site begins: - ANSWER-After an interim or final QC Plan is accepted. All submittals for government approval must be provided by the _________________ in time to allow for the review, approval, procurement, delivery, and performance of preparatory phase for an item before it is needed for construction. - ANSWER-Contractor to the Government An effective contractor quality control program will: - ANSWER-Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. Characteristics that describe a definable feature of work include: - ANSWER-Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications. Construction Quality Management is the performance of tasks, which ensure that construction is performed. - ANSWER-According to plans and specifications, on time, within a defined budget and a safe work environment. Contractor testing procedures: - ANSWER-Are outlined in the Quality Control Plan as defined by Section 01450N/01451A and addressed at the Coordination and Mutual Understanding Meeting (Navy). Design-Build contracts require: - ANSWER-The QC Manager to be in place and take an active role in the review and coordination of the design. During the punch-out inspection of a project: - ANSWER-Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. ENG Form 4288-R, the submittal register: - ANSWER-Identifies those submittals requiring government approval
Document information
- Uploaded on
- July 2, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers