100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CM 1011 Chapter 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
26-06-2024
Written in
2023/2024

CM 1011 Chapter 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Institution
Course








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Course

Document information

Uploaded on
June 26, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CM 1011 Chapter 5
Pre-Construction Stage - ANS--first
-Assign project team, due diligence, value engineering, permitting

Procurement stage - ANS--second
-Project but-out, subcontracts, purchase orders

Construction stage - ANS--third
-Mobilization, staging, layout, operations

post construction stage - ANS--fourth
-project close out, owners move-in, warranty, project evaluation

design stage - ANS-includes programming and feasibility, schematic design, design
development, and contract documents

Programming and feasibility - ANS-done prior to design and engages the owner to clarify needs

schematic design - ANS-first step of creative process consisting of sketches that identify
preliminary design characteristics

design development - ANS-detail of the work design occurs here. selection of material,
equipment and systems to go into building

contract documents - ANS--final detailed drawings known working drawings and the project
specifications are known as the CD's
-they are the plans that the builder will actually use for construction

Goal of the design team - ANS-make the building compliant with various statutory regulations.
project success relies on compliance with regulations

bidding stage - ANS--plans and specifications are produced for builders
-this stage is coordinated by the architect to assist the owner

pre-construction stage - ANS--stage where the project manager is captain of the construction
team
-one of the hardest stages

On-site and Office support - ANS-The project team is split into which two divisions?
$7.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DoctorHkane Havard School
Follow You need to be logged in order to follow users or courses
Sold
732
Member since
4 year
Number of followers
168
Documents
22458
Last sold
1 day ago

Explore my Stuvia collection for essential study aids: test banks, exams, summaries, and cases. With five years of expertise as an academic writer, I have honed my skills in crafting top-notch essays, exams, and research dissertations. My proficiency lies in producing well-structured and thoroughly researched content that meets academic standards. I am adept at handling various subjects and ensuring a seamless flow of ideas. Whether it's delivering compelling arguments in essays, creating challenging yet fair exam questions, or delving into in-depth research for dissertations, my experience equips me to excel in diverse academic writing tasks. I pride myself on meeting deadlines and maintaining the highest quality in every piece I produce. REACH ON iamnjokikelvin1@gmail

Read more Read less
4.6

386 reviews

5
308
4
29
3
21
2
10
1
18

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions