Rework - ANS-A term used to describe defective construction work that must be redone or
corrected
Callback - ANS-a request from an owner that a contractor return to the job site to correct or redo
some item of work
Preparatory Inspection - ANS-Inspections, sometimes called preinspections are designed to
check progress and make sure everything is ready for the next stage of construction
Total Quality Management - ANS-A recognized quality control and quality assurance program
based on continuous quality improvements practices
Quality Control - ANS-A quality management approach that addresses quality at the project
level and deals with conformance to the plans and specs through submittals, mock-ups, shop
drawings, inspections, and testing.
Quality Assurance - ANS-A quality management approach that addresses quality at the process
level and deals with policies and procedures associated with hiring, training, safety,
subcontracting, and procurement.
tailgate safety meetings - ANS-Weekly safety meetings held at the job site and usually
conducted by the superintendent. They're also called toolbox safety meetings.